Unequal Worker Exposure to Establishment Deaths

2021 ◽  
pp. 102073
Author(s):  
Hugh Macartney ◽  
Eric Nielsen ◽  
Viviana Rodriguez
Keyword(s):  
2010 ◽  
Vol 11 (1) ◽  
pp. 21 ◽  
Author(s):  
Thomas P. Kuhar ◽  
James F. Walgenbach ◽  
Hélène B. Doughty

Chlorantraniliprole (=Rynaxypyr) is a novel anthranilic diamide insecticide that is of interest to vegetable growers because of its low mammalian toxicity and systemic properties. Field trials were conducted between 2006 and 2008 in North Carolina and Virginia to test the efficacy of chlorantraniliprole as a drip chemigation treatment on tomatoes. Drip chemigation of chlorantraniliprole at various rates and intervals significantly reduced the percentage of tomatoes damaged by tomato fruitworm (Helicoverpa zea) comparable to that typically achieved from multiple foliar applications of insecticides. The best control was achieved with two applications of chlorantraniliprole at 0.074 kg ai/ha, or a single application at 0.099 kg ai/ha. Residual ingestion bioassays showed that chlorantraniliprole was effectively taken up by the roots and was active in leaves up to 66 days after treatment (DAT), active in blossoms up to 22 DAT, but was not active in fruit. Drip chemigation of chlorantraniliprole may offer several advantages over foliar applications, including ease of application, reduced pesticide input into the environment, reduced worker exposure to pesticides, and reduced risk to beneficial arthropods. Accepted for publication 14 January 2010. Published 7 April 2010.


1991 ◽  
Vol 21 (2) ◽  
pp. 195-201 ◽  
Author(s):  
J. E. Cowell ◽  
C. M. Lottman ◽  
M. J. Manning

Author(s):  
Bert Kroes ◽  
Edmond Gobert ◽  
Xavier Delhaye ◽  
Peter Devolder ◽  
Michel Sonville

The Doel 1 and 2 PWR Nuclear Power Stations are the oldest commercially operating units in Belgium and the last to replace their two Steam Generators. The Doel 2 Steam Generators were replaced in 2004 and those of Doel 1 will be replaced late 2009. The replacement poses a particular challenge as these are the only stations in Belgium requiring the creation of primary and secondary containment opening for the SG exchange operation. Other construction challenges result from the a-typical SG support configuration which dates from the period well before the more or less standardized support configuration as used for later PWR units. The current paper discusses the construction approaches selected to facilitate the exchange operation and to minimize the outage duration and radiation worker exposure. The main particularities of the construction effort concern the secondary containment opening and closing using a structural formwork assembly, the use of containment platforms hanging inside the primary containment allowing for parallel primary and secondary containment reconstruction and the de-activation of some of the primary coolant piping and SG restraints following the licensing acceptance of the Leak Before Break concept for the primary piping. The specific construction options that made the Doel 2 replacement a success will be presented in this paper.


Sign in / Sign up

Export Citation Format

Share Document