scholarly journals Assessing and Prioritising Delay Factors of Prefabricated Concrete Building Projects in China

2018 ◽  
Vol 8 (11) ◽  
pp. 2324 ◽  
Author(s):  
Yingbo Ji ◽  
Lin Qi ◽  
Yan Liu ◽  
Xinnan Liu ◽  
Hong Li ◽  
...  

Prefabricated construction has been widely accepted as an alternative to conventional cast-in-situ construction, given its improved performance. However, prefabricated concrete building projects frequently encounter significant delays. It is, therefore, crucial to identify key factors affecting schedule and explore strategies to minimise the schedule delays for prefabricated concrete building projects. This paper adopts the decision-making trial and evaluation laboratory (DEMATEL) model and analytic network process (ANP) method to quantify the cause-and-effect relationships and prioritise the key delay factors in terms of their importance in the Chinese construction industry. The DEMATEL model evaluates the extent to which each factor impacts other factors. The quantified extents are then converted into a prioritisation matrix through ANP. The delay factors of prefabricated construction projects are selected and categorised based on a literature review and an expert interview. Questionnaires are then implemented to collect the data. The results reveal that the issue of inefficient structural connections for prefabricated components is found to be the most significant factor and most easily affected by other delay factors. This research also suggests prioritising major delay factors, such as ‘lack of communication among participants’ and ‘low productivity’, in the Chinese construction industry during scheduling control. Overall, this research contributes an assessment framework for decision making in the scheduling management of prefabricated construction.

2021 ◽  
Vol 14 (2) ◽  
pp. 62-70
Author(s):  
Huda Yaseen ◽  
Hafeth I. Naji

Construction projects are of a special nature affected by many factors, which makes them exposed to multiple risks that may lead to the abandonment of projects. Recently, the Iraqi construction sector is facing a number of problems. Abandoned construction projects are one of the most common and dangerous problems in the construction industry in Iraq, with their negative effects on stakeholders, the economy, and the environment due to the lack of sufficient financial and administrative capabilities to complete construction projects, which is reflected in exceeding the time limit for the completion of projects. The aim of this research is to use the analytic network process (ANP) technique to choose the best form of Public-Private Partnership (PPP) contracts to fund abandoned projects in Iraq. using a questionnaire survey to determine the most criteria and alternatives for selecting appropriate financing for the abandoned project. The results shown final weight of the Build-Own-Operate (BOO) contract from ANP is 0.533, which is the best form of PPP contract among the alternatives proposed to fund the project.


2017 ◽  
Vol 728 ◽  
pp. 411-415 ◽  
Author(s):  
Nguyen Thanh Phong ◽  
Van Nguyen Phuc ◽  
To Thuy Hoang Le Nguyen Quyen

Materials account for a significant proportion of engineering and construction projects budget. Therefore, selecting appropriate material supplier criteria is a critical economic decision, and it plays a significant role in the success of any engineering and construction firms. Traditional supplier evaluating decision-making methods are usually based on subjective opinions of experts, resulting in irrational and inappropriate decisions. This paper proposes a quantitative model for selecting a material supplier by using the Fuzzy Analytic Network Process and TOPSIS method. In this model, the material supplier selection criteria are weighted by using Group Fuzzy Analytic Network Process (GFANP). Then material suppliers are ranked using the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) method. The proposed decision-making model can provide a robust approach for solving material supplier selection problems.


2018 ◽  
Vol 8 (4) ◽  
pp. 80 ◽  
Author(s):  
Alireza Valipour ◽  
Hadi Sarvari ◽  
Jolanta Tamošaitiene

Recently, risk assessment has become one of the most challenging issues in the areas of construction and public-private partnerships (PPPs). To address risk assessment issues, various decision-making techniques have been proposed, each with its own specific disadvantages and advantages. This paper investigates step-wise weight assessment ratio analysis (SWARA), complex proportional assessment (COPRAS), fuzzy analytic network process (FANP), fuzzy analytic hierarchy process (FAHP), fuzzy technique for order of preference by similarity to ideal solution (FTOPSIS), simple additive weighting (SAW) and evaluation based on distance from average solution (EDAS) in order to define how various multi-attribute decision-making (MADM) methods compare when used for risk assessment in PPP projects. For this study, 5 risk assessment criteria and 10 types of risk used in Iranian highway PPP projects were selected. Four suitability and applicability tests were used to measure agreement between the rankings derived from the MADM methods. Final results show that all techniques had approximately the same rankings of risk assessment, with the SWARA, COPRAS, and EDAS methods performing slightly better. The findings of this study will help the parties in PPP and construction projects to select the best risk assessment method.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2018 ◽  
Vol 31 ◽  
pp. 12006 ◽  
Author(s):  
Lisa Rolita ◽  
Bayu Surarso ◽  
Rahmat Gernowo

In order to improve airport safety management system (SMS) performance, an evaluation system is required to improve on current shortcomings and maximize safety. This study suggests the integration of the DEMATEL and ANP methods in decision making processes by analyzing causal relations between the relevant criteria and taking effective analysis-based decision. The DEMATEL method builds on the ANP method in identifying the interdependencies between criteria. The input data consists of questionnaire data obtained online and then stored in an online database. Furthermore, the questionnaire data is processed using DEMATEL and ANP methods to obtain the results of determining the relationship between criteria and criteria that need to be evaluated. The study cases on this evaluation system were Adi Sutjipto International Airport, Yogyakarta (JOG); Ahmad Yani International Airport, Semarang (SRG); and Adi Sumarmo International Airport, Surakarta (SOC). The integration grades SMS performance criterion weights in a descending order as follow: safety and destination policy, safety risk management, healthcare, and safety awareness. Sturges' formula classified the results into nine grades. JOG and SMG airports were in grade 8, while SOG airport was in grade 7.


2017 ◽  
Vol 7 (1) ◽  
pp. 100
Author(s):  
Wen-Tsung Wu ◽  
Chie-Bein Chen

This study investigates the decision-making issues in the selection of destinations for large-scale exhibitions by the cultural and creative industry. We use the Rubber Duck China Tour by the Dutch artist Florentijn Hofman as an example and adopt the analytic network process technique to evaluate destination options for the exhibition, as well as to explore the impacts of the evaluation of destination feasibilities on exhibition investment. The results show that power, a high benefit-cost ratio, first-tier cities, integration with local communities, and a rich and interesting theme are the top five factors that curators should consider when planning exhibitions. Considering the priority among cities of various tiers, first-tier cities are the most favorable, followed by fourth-tier, third-tier, and second-tier cities. The decision-making model provides curators with a reliable reference for selecting destinations for future exhibitions.