APPLYING METAHEURISTIC STRATEGIES IN CONSTRUCTION PROJECTS MANAGEMENT
2012 ◽
Vol 18
(5)
◽
pp. 621-630
◽
Keyword(s):
The Real
◽
This work deals with the application of artificial intelligence instruments in a building schedule. In this article there was presented an original optimization scatter search algorithm taking into consideration both technological and organizational restrictions. This algorithm was applied to the real analysis of the industrial building project realization.
2010 ◽
Vol 29
(2-3)
◽
pp. 111-119
◽
Keyword(s):
Keyword(s):