Scheduling problem in seru production system considering DeJong’s learning effect and job splitting

Author(s):  
Zhe Zhang ◽  
Xiaoling Song ◽  
Huijun Huang ◽  
Yong Yin ◽  
Benjamin Lev
2016 ◽  
Vol 74 ◽  
pp. 175-186 ◽  
Author(s):  
Jianyou Xu ◽  
Chin-Chia Wu ◽  
Yunqiang Yin ◽  
Chuanli Zhao ◽  
Yi-Tang Chiou ◽  
...  

2015 ◽  
Vol 2015 ◽  
pp. 1-12 ◽  
Author(s):  
Sergio Fichera ◽  
Antonio Costa ◽  
Fulvio Cappadonna

The present paper aims to address the flow-shop sequence-dependent group scheduling problem with learning effect (FSDGSLE). The objective function to be minimized is the total completion time, that is, the makespan. The workers are required to carry out manually the set-up operations on each group to be loaded on the generic machine. The operators skills improve over time due to the learning effects; therefore the set-up time of a group under learning effect decreases depending on the order the group is worked in. In order to effectively cope with the issue at hand, a mathematical model and a hybrid metaheuristic procedure integrating features from genetic algorithms (GA) have been developed. A well-known problem benchmark risen from literature, made by two-, three- and six-machine instances, has been taken as reference for assessing performances of such approach against the two most recent algorithms presented by literature on the FSDGS issue. The obtained results, also supported by a properly developed ANOVA analysis, demonstrate the superiority of the proposed hybrid metaheuristic in tackling the FSDGSLE problem under investigation.


Author(s):  
Zineb Ibn Majdoub Hassani ◽  
Abdellah El Barkany ◽  
Abdelouahhab Jabri ◽  
Ikram El Abbassi

This article concerns the integration of planning and scheduling production system. Planning and scheduling are usually treated separately because of their complexity. Scheduling largely depends on the production quantities computed at the production planning level. However, ignoring scheduling constraints in the tactical level leads to inconsistent decisions. So, it is important to integrate planning and scheduling to efficiently manage operations and to determine a realistic production plan for a given sequence of jobs on each machine. In this paper, we present some approaches proposed to solve the problem and we realize a comparison between the two most interesting ones, using the standard solver CPLEX.


Sign in / Sign up

Export Citation Format

Share Document