Planning water resources systems with interval stochastic dynamic programming

2006 ◽  
Vol 21 (6) ◽  
pp. 997-1014 ◽  
Author(s):  
B. Luo ◽  
I. Maqsood ◽  
G. H. Huang
2019 ◽  
Vol 11 (24) ◽  
pp. 6926 ◽  
Author(s):  
Zhenfang Liu ◽  
Yang Zhou ◽  
Gordon Huang ◽  
Bin Luo

In this study, a dual interval robust stochastic dynamic programming (DIRSDP) method is developed for planning water resources management systems under uncertainty. As an extension of the existing interval stochastic dynamic programming (ISDP) method, DIRSDP can deal with two-stage stochastic programming (TSP)-based planning problems associated with dynamic features, input uncertainties, and multistage concerns. Compared with other optimization methods dealing with uncertainties, the developed DIRSDP method has advantages in addressing uncertainties with complex presentations and reflecting decision makers’ risk-aversion attitudes within its optimization process. Parameters in the DIRSDP model can be represented as probability distributions as well as single and/or dual intervals. Decision makers’ risk-aversion attitudes can be reflected through restricting the deviation of the recourse costs to a tolerance level. Water-allocation plans can then be developed based on the analysis of tradeoffs between the system benefit and solution robustness. The developed method is applied to a case of water resources management planning. The solutions are reasonable, indicating applicability of the developed methodology.


Water ◽  
2022 ◽  
Vol 14 (2) ◽  
pp. 220
Author(s):  
Hongxue Zhang ◽  
Lianpeng Zhang ◽  
Jianxia Chang ◽  
Yunyun Li ◽  
Ruihao Long ◽  
...  

Hydropower plant operation reorganizes the temporal and spatial distribution of water resources to promote the comprehensive utilization of water resources in the basin. However, a lot of uncertainties were brought to light concerning cascade hydropower plant operation with the introduction of the stochastic process of incoming runoff. Therefore, it is of guiding significance for the practice operation to investigate the stochastic operation of cascade hydropower plants while considering runoff uncertainty. The runoff simulation model was constructed by taking the cascade hydropower plants in the lower reaches of the Lancang River as the research object, and combining their data with the copula joint function and Gibbs method, and a Markov chain was adopted to construct the transfer matrix of runoff between adjacent months. With consideration for the uncertainty of inflow runoff, the stochastic optimal operation model of cascade hydropower plants was constructed and solved by the SDP algorithm. The results showed that 71.12% of the simulated monthly inflow of 5000 groups in the Nuozhadu hydropower plant drop into the reasonable range. Due to the insufficiency of measured runoff, there were too many 0 values in the derived transfer probability, but after the simulated runoff series were introduced, the results significantly improved. Taking the transfer probability matrix of simulated runoff as the input of the stochastic optimal operation model of the cascade hydropower plants, the operation diagram containing the future-period incoming water information was obtained, which could directly provide a reference for the optimal operation of the Nuozhadu hydropower plant. In addition, taking the incoming runoff process in a normal year as the standard, the annual mean power generation based on stochastic dynamic programming was similar to that based on dynamic programming (respectively 305.97 × 108kW⋅h and 306.91 × 108kW⋅h), which proved that the operation diagram constructed in this study was reasonable.


Energies ◽  
2021 ◽  
Vol 14 (3) ◽  
pp. 625
Author(s):  
Xinyu Wu ◽  
Rui Guo ◽  
Xilong Cheng ◽  
Chuntian Cheng

Simulation-optimization methods are often used to derive operation rules for large-scale hydropower reservoir systems. The solution of the simulation-optimization models is complex and time-consuming, for many interconnected variables need to be optimized, and the objective functions need to be computed through simulation in many periods. Since global solutions are seldom obtained, the initial solutions are important to the solution quality. In this paper, a two-stage method is proposed to derive operation rules for large-scale hydropower systems. In the first stage, the optimal operation model is simplified and solved using sampling stochastic dynamic programming (SSDP). In the second stage, the optimal operation model is solved by using a genetic algorithm, taking the SSDP solution as an individual in the initial population. The proposed method is applied to a hydropower system in Southwest China, composed of cascaded reservoir systems of Hongshui River, Lancang River, and Wu River. The numerical result shows that the two-stage method can significantly improve the solution in an acceptable solution time.


Sign in / Sign up

Export Citation Format

Share Document