The approximate cost estimating model for railway bridge project in the planning phase using CBR method
2011 ◽
Vol 15
(7)
◽
pp. 1149-1159
◽
2013 ◽
Vol 33
(2)
◽
pp. 781-790
Keyword(s):
Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method
2013 ◽
Vol 14
(3)
◽
pp. 42-52
◽
2009 ◽
Vol 13
(6)
◽
pp. 377-388
◽
2010 ◽
Vol 15
(1)
◽
pp. 33-42
◽
2013 ◽
Vol 33
(2)
◽
pp. 791-800
◽
Keyword(s):
2013 ◽
Vol 17
(2)
◽
pp. 292-300
◽
Keyword(s):
2012 ◽
Vol 16
(3)
◽
pp. 283-292
◽
Keyword(s):
1913 ◽
Vol 75
(1942supp)
◽
pp. 181-181
Keyword(s):
1892 ◽
Vol 14
(6build)
◽
pp. 86-86
Keyword(s):