Determining critical thresholds of ecological restoration based on ecosystem service index: A case study in the Pingjiang catchment in southern China

2022 ◽  
Vol 303 ◽  
pp. 114220
Author(s):  
Cong Wang ◽  
Chongjun Tang ◽  
Bojie Fu ◽  
Yihe Lü ◽  
Shengsheng Xiao ◽  
...  
2019 ◽  
Vol 3 (1) ◽  
pp. 1-9
Author(s):  
Robert M. Anderson ◽  
Amy M. Lambert

The island marble butterfly (Euchloe ausonides insulanus), thought to be extinct throughout the 20th century until re-discovered on a single remote island in Puget Sound in 1998, has become the focus of a concerted protection effort to prevent its extinction. However, efforts to “restore” island marble habitat conflict with efforts to “restore” the prairie ecosystem where it lives, because of the butterfly’s use of a non-native “weedy” host plant. Through a case study of the island marble project, we examine the practice of ecological restoration as the enactment of particular norms that define which species are understood to belong in the place being restored. We contextualize this case study within ongoing debates over the value of “native” species, indicative of deep-seated uncertainties and anxieties about the role of human intervention to alter or manage landscapes and ecosystems, in the time commonly described as the “Anthropocene.” We interpret the question of “what plants and animals belong in a particular place?” as not a question of scientific truth, but a value-laden construct of environmental management in practice, and we argue for deeper reflexivity on the part of environmental scientists and managers about the social values that inform ecological restoration.


2012 ◽  
Vol 17 (2) ◽  
pp. 174-179 ◽  
Author(s):  
Chuanyan ZHOU ◽  
Xun CHEN ◽  
Xiaoling LIU ◽  
Weiquan ZHAO ◽  
Kun LI ◽  
...  

Forests ◽  
2021 ◽  
Vol 12 (3) ◽  
pp. 267
Author(s):  
Lydia Olander ◽  
Katie Warnell ◽  
Travis Warziniack ◽  
Zoe Ghali ◽  
Chris Miller ◽  
...  

A shared understanding of the benefits and tradeoffs to people from alternative land management strategies is critical to successful decision-making for managing public lands and fostering shared stewardship. This study describes an approach for identifying and monitoring the types of resource benefits and tradeoffs considered in National Forest planning in the United States under the 2012 Planning Rule and demonstrates the use of tools for conceptualizing the production of ecosystem services and benefits from alternative land management strategies. Efforts to apply these tools through workshops and engagement exercises provide opportunities to explore and highlight measures, indicators, and data sources for characterizing benefits and tradeoffs in collaborative environments involving interdisciplinary planning teams. Conceptual modeling tools are applied to a case study examining the social and economic benefits of recreation on the Ashley National Forest. The case study illustrates how these types of tools facilitate dialog for planning teams to discuss alternatives and key ecosystem service outcomes, create easy to interpret visuals that map details in plans, and provide a basis for selecting ecosystem service (socio-economic) metrics. These metrics can be used to enhance environmental impact analysis, and help satisfy the goals of the National Environmental Policy Act (NEPA), the 2012 Planning Rule, and shared stewardship initiatives. The systematic consideration of ecosystem services outcomes and metrics supported by this approach enhanced dialog between members of the Forest planning team, allowed for a more transparent process in identification of key linkages and outcomes, and identified impacts and outcomes that may not have been apparent to the sociologist who is lacking the resource specific expertise of these participants. As a result, the use of the Ecosystem Service Conceptual Model (ESCM) process may result in reduced time for internal reviews and greater comprehension of anticipated outcomes and impacts of proposed management in the plan revision Environmental Impact Statement amongst the planning team.


Author(s):  
M Natarajan ◽  
V Johnpaul ◽  
R Sindhu ◽  
K Jayalakshmi

Land ◽  
2021 ◽  
Vol 10 (4) ◽  
pp. 344
Author(s):  
Haochen Yu ◽  
Jiu Huang ◽  
Chuning Ji ◽  
Zi’ao Li

A large-scale energy and chemical industry base is an important step in the promotion of the integrated and coordinated development of coal and its downstream coal-based industry. A number of large-scale energy and chemical industrial bases have been built in the Yellow River Basin that rely on its rich coal resources. However, the ecological environment is fragile in this region. Once the eco-environment is destroyed, the wildlife would lose its habitat. Therefore, this area has attracted wide attention regarding the development of the coal-based industry while also protecting the ecological environment. An ecological network could improve landscape connectivity and provide ideas for ecological restoration. This study took the Ningdong Energy and Chemical Industrial Base as a case study. Morphological spatial pattern analysis was applied to extract core patches. The connectivity of the core patches was evaluated, and then the ecological source patches were recognized. The minimum cumulative resistance model, hydrologic analysis and circuit theory were used to simulate the ecological network. Then, ecological corridors and ecological nodes were classified. The results were as follows: (1) The vegetation fractional coverage has recently been significantly improved. The area of core patches was 22,433.30 ha. In addition, 18 patches were extracted as source patches, with a total area of 9455.88 ha; (2) Fifty-eight potential ecological corridors were simulated. In addition, it was difficult to form a natural ecological corridor because of the area’s great resistance. Moreover, the connectivity was poor between the east and west; (3) A total of 52 potential ecological nodes were simulated and classified. The high-importance nodes were concentrated in the western grassland and Gobi Desert. This analysis indicated that restoration would be conducive to the ecological landscape in this area. Furthermore, five nodes with high importance but low vegetation fractional coverage should be given priority in later construction. In summary, optimizing the ecological network to achieve ecological restoration was suggested in the study area. The severe eco-environmental challenges urgently need more appropriate policy guidance in the large energy and chemical bases. Thus, the ecological restoration and ecological network construction should be combined, the effectiveness of ecological restoration could be effectively achieved, and the cost could also be reduced.


Sign in / Sign up

Export Citation Format

Share Document