scholarly journals Using community surveys with participatory mapping to monitor comprehensive plan implementation

2022 ◽  
Vol 218 ◽  
pp. 104306
Author(s):  
Greg Brown ◽  
Marketta Kyttä ◽  
Pat Reed
Author(s):  
Mikhailenko O. ◽  
Shcherbak Yu. ◽  
Kolos T.

In today's conditions, the interest of enterprises in the implementation of restructuring is constantly growing. Until recently, only enterprises that were in a pre-crisis or crisis state were interested in the restructuring tool, but the constant trends of changes in the economic environment encourage successful enterprises to use restructuring as well. Restructuring is considered as an effective tool for overcoming crisis phenomena in the activities of economic entities, increase efficiency, level of competitiveness and value of enterprises. The experience of enterprise restructuring in different periods of economic development allows to characterize the purpose, objectives of restructuring, describes its main stages, determine the features of the restructuring process and develop an algorithm for restructuring. In the study of enterprise restructuring, the main conceptual ideas of existing theoretical models of formation of organizational support for restructuring were identified. Analyzing the stages of the restructuring and the documents that help its implementation, it was concluded that the requirements of the parties interested in the restructuring are not met. This necessitates the definition of the main documents that need to be formed at each stage of the restructuring and the development of an effective business plan for its implementation. The development of a business restructuring plan should be based on the transformation of one alternative option to achieve the established objectives of the restructuring and be a comprehensive plan of specific actions with the definition of deadlines, resources, persons responsible for their implementation. The authors analyze the existing approaches to the development of a business restructuring plan and propose their own structure of the business restruc-turing plan of the enterprise, which includes the formation of a questionnaire – a summary of the enterprise, the target restructuring program and the restructuring plan. The practical significance of the obtained results is that the theoretical provisions of the article have an applied value and can be used in any economic activity of enterprises in modern business conditions.Keywords: restructuring, restructuring business plan, target restructuring program, stages of restructuring, restructuring methods, restructuring measures, restructuring concept, business plan implementation. В умовах сьогодення інтерес підприємств до здійснення реструктуризації постійно зростає, зумовлюючи необхідність у визначення основних етапів реструктуризації та розроблені дієвого бізнес-плану її реалізації. У даній статті узагальнено поняття реструктуризації підприємства, охарактеризовано мету, цілі проведення реструктуризації та описано основні її етапи. Авторами здійснено аналізування існуючих підходів до розробки бізнес-плану реструктуризації та запропоновано власну структуру бізнес-плану реструктуризації підприємства. Встановлено, що розробка бізнес-плану реструктуризації повинна являти собою комплексний план конкретних дій з визначенням строків, ресурсів, відповідальних осіб за їх реалізацію. Практична значущість одержаних результатів полягає в тому, що теоретичні положення статті мають прикладне значення та можуть бути використані в будь-якій економічній діяльності підприємств в сучасних умовах господарювання. Ключові слова: реструктуризація, бізнес-план реструктуризації, цільова програма реструктуризації, етапи проведення реструктуризації, методи реструктуризація, заходи реструктуризації, концепція реструктуризації, реалізація бізнес-плану.


2020 ◽  
Vol 11 (2) ◽  
pp. 67-82
Author(s):  
Ardian Alfianto ◽  
Shandy Cecilia

Since 1932, Limboto Lake has been experiencing siltation, in 2006 it was measured that about 4.000 hectare of lake was covered. It was predicted by many that in 2031 Lake Limboto would disappear. The ‘Lake Limboto Revitalization’ has been conducted since 2017 by conducting many activities, including sabo plan implementation (also known as sabo technology). This study was originally conducted to review sabo plan in Limboto Lake, however this particular report was conducted to measure potential of erosion and sedimentation using WaTEM/SEDEM Model. Among 12 upstream rivers/Sub-DAS flowing into Limboto Lake, here were rivers with most potential to bring erosion and sedimentation into the lake to the least: Batulayar 193.662 m3, Biyonga Boluta 123.095 m3, Alo1 120.273m3, Alo 115.204 m3, Molamahu 73.058 m3, Marisa 57.075 m3, Pulubala 53.445 m3, Pone 40.254 m3, Molamahu1 39.585 m3, Pilolalenga 32.306 m3, Talumelito 32.247 m3, Pulubala2 31.267 m3, Tuladengi 28.908 m3, Pone1 27.306 m3, Payunga 26.746 m3, Biyonga Boluta1 25.895 m3, Pilolalenga1 21.841 m3, Tabongo 20.151 m3, Pulubala1 17.741 m3, and Tabongo1 11.031 m3. Considering the river dynamics as well as absence of secondary data about rivers, it was crucial to review sabo plan and to measure sedimentation potential per year.


2018 ◽  
pp. 64-68
Author(s):  
George V. Boos ◽  
Elena Yu. Matveeva

The problematic aspects related to the implementation of energy saving policy in the budget sphere are examined in the article. The factors hindering the mass and effective implementation of energysaving measures are highlighted in the article. Among these factors, there is the technical complexity of energysaving projects, the presence of innovative and investment risks, problems with the financial provision of costs in the face of increasing debt burden in most public budgets. The article concludes that in these circumstances only the energy service contract is a tool that allows implementing energy­saving measures without the first participation of budgetary funds in financing and allows transferring the risks of making technically inefficient decisions directly to the investor. In the article, the authors substantiate the importance of the institutional development of energy services directly in the public sector and analyze the measures of the comprehensive plan to improve the energy efficiency of the economy of the Russian Federation aimed at expanding the scope of energy service contracts in the public sector.


Author(s):  
Steven Hurst

The United States, Iran and the Bomb provides the first comprehensive analysis of the US-Iranian nuclear relationship from its origins through to the signing of the Joint Comprehensive Plan of Action (JCPOA) in 2015. Starting with the Nixon administration in the 1970s, it analyses the policies of successive US administrations toward the Iranian nuclear programme. Emphasizing the centrality of domestic politics to decision-making on both sides, it offers both an explanation of the evolution of the relationship and a critique of successive US administrations' efforts to halt the Iranian nuclear programme, with neither coercive measures nor inducements effectively applied. The book further argues that factional politics inside Iran played a crucial role in Iranian nuclear decision-making and that American policy tended to reinforce the position of Iranian hardliners and undermine that of those who were prepared to compromise on the nuclear issue. In the final chapter it demonstrates how President Obama's alterations to American strategy, accompanied by shifts in Iranian domestic politics, finally brought about the signing of the JCPOA in 2015.


2008 ◽  
Author(s):  
W. D. Haigler ◽  
Walt R. Keays ◽  
Milton L. Naumann ◽  
David R. Warren

Sign in / Sign up

Export Citation Format

Share Document