Minimizing the makespan for the flow shop scheduling problem with availability constraints
2004 ◽
Vol 153
(3)
◽
pp. 534-543
◽
Keyword(s):
Keyword(s):
2014 ◽
Vol 73
(5-8)
◽
pp. 601-611
◽
Keyword(s):
Keyword(s):
2013 ◽
Vol 32
(1)
◽
pp. 167-173
◽
Keyword(s):
2014 ◽
Vol 53
(3)
◽
pp. 944-968
◽
1989 ◽
Vol 40
(4)
◽
pp. 395-399
◽