scholarly journals Open pit limit optimization considering economic profit, ecological costs and social benefits

2021 ◽  
Vol 31 (12) ◽  
pp. 3847-3861
Author(s):  
Xiao-chuan XU ◽  
Xiao-wei GU ◽  
Qing WANG ◽  
Yun-qi ZHAO ◽  
Zong-kang WANG
2006 ◽  
Author(s):  
Michael J. Poulin ◽  
Roxanne C. Silver ◽  
Virginia Gil-Rivas ◽  
E. Allison Holman ◽  
Daniel N. McIntosh
Keyword(s):  

2005 ◽  
Author(s):  
Jeff Schimel ◽  
Todd Williams ◽  
Jamie Arndt
Keyword(s):  

1974 ◽  
Vol 53 (10) ◽  
pp. 383 ◽  
Author(s):  
G.Margaret Fazakerley

CFA Digest ◽  
2004 ◽  
Vol 34 (1) ◽  
pp. 17-18
Author(s):  
Erik Skaden
Keyword(s):  

2012 ◽  
Vol 57 (2) ◽  
pp. 363-373
Author(s):  
Jan Macuda

Abstract In Poland all lignite mines are dewatered with the use of large-diameter wells. Drilling of such wells is inefficient owing to the presence of loose Quaternary and Tertiary material and considerable dewatering of rock mass within the open pit area. Difficult geological conditions significantly elongate the time in which large-diameter dewatering wells are drilled, and various drilling complications and break-downs related to the caving may occur. Obtaining higher drilling rates in large-diameter wells can be achieved only when new cutter bits designs are worked out and rock drillability tests performed for optimum mechanical parameters of drilling technology. Those tests were performed for a bit ø 1.16 m in separated macroscopically homogeneous layers of similar drillability. Depending on the designed thickness of the drilled layer, there were determined measurement sections from 0.2 to 1.0 m long, and each of the sections was drilled at constant rotary speed and weight on bit values. Prior to drillability tests, accounting for the technical characteristic of the rig and strength of the string and the cutter bit, there were established limitations for mechanical parameters of drilling technology: P ∈ (Pmin; Pmax) n ∈ (nmin; nmax) where: Pmin; Pmax - lowest and highest values of weight on bit, nmin; nmax - lowest and highest values of rotary speed of bit, For finding the dependence of the rate of penetration on weight on bit and rotary speed of bit various regression models have been analyzed. The most satisfactory results were obtained for the exponential model illustrating the influence of weight on bit and rotary speed of bit on drilling rate. The regression coefficients and statistical parameters prove the good fit of the model to measurement data, presented in tables 4-6. The average drilling rate for a cutter bit with profiled wings has been described with the form: Vśr= Z ·Pa· nb where: Vśr- average drilling rate, Z - drillability coefficient, P - weight on bit, n - rotary speed of bit, a - coefficient of influence of weight on bit on drilling rate, b - coefficient of influence of rotary speed of bit on drilling rate. Industrial tests were performed for assessing the efficiency of drilling of large-diameter wells with a cutter bit having profiled wings ø 1.16 m according to elaborated model of average rate of drilling. The obtained values of average rate of drilling during industrial tests ranged from 8.33×10-4 to 1.94×10-3 m/s and were higher than the ones obtained so far, i.e. from 181.21 to 262.11%.


Author(s):  
V. V. Agafonov ◽  
V. Yu. Zalyadinov ◽  
M. E. Yusupov ◽  
N. S. Bikteeva

Sustainability of mining companies is of of high concern. The problem is specifically acute at companies that are monotownor monosettlement-forming. Sustainability of a mine depends in many ways on product quality and production resource-intensity. This article discusses formation of mineral quality indexes in terms of an open pit chrysotile mine. The studies took into account specific features of operation procedures implemented by each structural division of the mine. The analysis has found managerial and technological inconsistencies which affect quality and marketable product output, as well as efficiency of the mine in whole. The background for efficiency enhancement at a company is, by the authors’ opinion, consolidation of personnel subject to the single development strategy, namely: improvement of production and control efficiency, as well as use of available reserves and resources by means of better setup for production. The proposed approaches to planning mining operations and forming mineral quality allow higher quality of processing stock. In addition, a new model proposed for interaction between structural divisions of a mining company ensures improvement of general production indexes.


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


Sign in / Sign up

Export Citation Format

Share Document