Construction technology and ecological protection of highway ecological panel reinforced retaining wall under green traffic target

2021 ◽  
Author(s):  
Liang Gao ◽  
Faqiang Rao ◽  
Ning Wang ◽  
Zongling Yan
2017 ◽  
Vol 42 (3) ◽  
pp. 45-49
Author(s):  
Weiqi Pei

With the development of the new rural construction action of beautiful industries, the problem of uncoordinated development of the rural economy and ecological protection has become increasingly prominent. Based on this, in the process of planning, design, construction and management, ecological construction technology was introduced. The planning and design of ecological recycling economy and rural greenway were studied, and the planning types of greenway in industrial villages were deeply explored. Taking the planning and construction of industrial rural greenway in Anji county as an example, the research and analysis were carried out. From the rural road, landscape space, ecology, service facilities, logo and so on, the planning was carried ou, and the greenway network of industrial villages in Anji county was constructed. Combined with practical engineering research, the scientific and rational development of rural greenway in the urban and rural construction throughout the countryn was promoted, the contradiction between urban and rural construction and ecological protection was effectively solved, and the construction of beautiful countryside was promoted.


2011 ◽  
Vol 255-260 ◽  
pp. 602-606
Author(s):  
Long Fei Cheng ◽  
Lin Yan Li

Masonry retaining structure consists of precast concrete blocks, which has good looks and is in harmony with environment. Blocks with proper shape can be used in fluctuating belt of the reservoir area. The construction of masonry structure should conform to the following steps: first, excavate the foundation ditch, lay a cushion and arrange the controlling points, insuring the quality of the first layer of blocks; it would be better to choose inorganic coarse-grained soil as filler and to set a water filtering layer with a height more than 30cm behind the retaining wall; carry on the construction of earth filling behind the wall after the blocks are fixed as requested, and then fix the geotechnical grille when the height of earth filling reaches the elevation of the grille; put Geotechnical Fabric between permeable aggregate and the earth filling behind it to keep the two materials from mixing.


2018 ◽  
Vol 46 (3) ◽  
pp. 284-296 ◽  
Author(s):  
Fei Song ◽  
Huabei Liu ◽  
Liqiu Ma ◽  
Hongbing Hu

2020 ◽  
Vol 20 (4) ◽  
pp. 04020017 ◽  
Author(s):  
Lihua Li ◽  
Junchao Yang ◽  
Henglin Xiao ◽  
Lei Zhang ◽  
Zhi Hu ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document