Building a Body of Knowledge in Project Management in Developing Countries

10.1142/11950 ◽  
2022 ◽  
Author(s):  
George Ofori
2005 ◽  
Vol 38 (1) ◽  
pp. 35-40
Author(s):  
Christopher Peterson ◽  
Zenon Chaczko ◽  
Craig Scott ◽  
David Davis

2017 ◽  
Vol 17 (1) ◽  
pp. 90-111 ◽  
Author(s):  
Micael Thunberg ◽  
Martin Rudberg ◽  
Tina Karrbom Gustavsson

Purpose This study aims to identify and categorise common on-site problems from a supply chain management (SCM) perspective and to trace the origin of these problems in the construction project process, the supply chain or in the intersection between these processes. This allows for identification of how on-site problems affect SCM in construction projects and how they can be mitigated. Design/methodology/approach A literature review in combination with semi-structured interviews was used to identify on-site problems. This enabled triangulation and strengthened both construct validity and internal validity. Findings On-site problems can be categorised in one of the four following categories: material flows, internal communication, external communication or complexity. The first category has its origin in the supply chain, the second in the construction project process, the third in the supply chain-construction process intersection on site and the fourth in the construction project as a whole. The findings conclude that on-site problems often originate from construction companies’ lack of supply chain orientation. Research limitations/implications It is suggested that supply chain planning (SCP) can facilitate on-site problem mitigation in construction project management. This extends the body of knowledge of SCP in construction project management and supports the development of effective on-site construction project management. Practical implications The results show that SCP can aid construction project management in handling on-site problems earlier in the project process. Originality/value The main value lies in extending the body of knowledge in construction project management research by applying an SCM perspective and by introducing SCP to support more effective construction project management.


2021 ◽  
Vol 97 ◽  
pp. 01036
Author(s):  
Valeriya Glazkova

Currently investment and construction activities are based on the implementation of development projects. As any project’s success heavily depends on joint efforts of a project team members, there is an urgent need for a motivation system able to stimulate team members’ result-orientation and satisfy their individual needs. The Project Management Body of Knowledge (PMBOK) methodology is suggested as a basis for building a sound development team motivation system, with its motivational tools correlating to stages of project management. The purpose of this article is to build methodical approach to system of motivation of the development project team. The methodological approach is formed taking into account the correspondence of the goal and the type of motivation depending on the stage of project management, as well as on the basis of the principles of forming the motivation system of the project team. The result is a constructed conceptual model for the development of a motivation system for the development project team based on the principles of PMBOK. Methods of comparative, empirical, system and economic analysis were used to substantiate the propositions put forward in the article.


Author(s):  
Bibi Eshrat Zamani ◽  
Azam Esfijani ◽  
Sayed Majid Abdellahi Damaneh

Although higher education systems in developing countries such as Iran have embraced the online education approach, they are confronted with significant challenges in this transition, one of which is lack of instructors' participation in online teaching. Therefore, this research is aimed at exploring barriers and influential factors for this lack of participation. The researchers developed their theoretical framework based on a thorough review of the existing body of knowledge while considering the cultural features of Iran as a developing country. A tailored questionnaire asking about the existence of three groups of barriers, namely personal, attitudinal and contextual inhibitors, was distributed among all faculty members who were candidates for delivering online courses in one of the top universities in the country. Data was analysed using the descriptive and inferential tests of Friedman, <em>t</em>-Test and ANOVA. The results were in line with research findings in other developing countries in which the contextual barriers had the most inhibition effect against faculty members’ participation in online teaching. Certain cultural barriers also are highlighted by participants, pertaining to the context of Iranian online education systems.


Projectus ◽  
2020 ◽  
Vol 3 (3) ◽  
pp. 86-108
Author(s):  
Melissa Procópio de Oliveira ◽  
José Luiz Fernandes

Este artigo trata de um proposta da utilização do Project Model Canvas como suporteao planejamento de um projeto da empresa Alfa. Ao longo do estudo, propõe-se queo Project Model Canvas seja utilizado em conjunto com a aplicação das boas práticasde gerenciamento de projetos do Project Management Body of Knowledge (PMBoK). Aintegração entre esses conhecimentos é detalhada através da área de riscos do projeto.


Sign in / Sign up

Export Citation Format

Share Document