An Integrated Multi-Period Layout Planning and Scheduling Model for Sustainable Reconfigurable Manufacturing Systems

2020 ◽  
Vol 19 (01) ◽  
pp. 31-64
Author(s):  
S. Ghanei ◽  
T. AlGeddawy

In a dynamic production environment, not only the customer’s needs change with time, but the economic aspects of that environment, such as energy pricing, also change. Reconfigurable Manufacturing Systems (RMSs) are designed to respond to such changes by reconfiguring system components efficiently. This paper presents a novel mathematical model to maximize energy sustainability of RMS. The novelty aspect of the model is the consideration of energy sustainability concurrently with system configuration and scheduling decisions in each period of the planning horizon. The objective of this mixed integer linear model is to minimize the total cost of energy consumption, system reconfiguration, and part transportation between machines, depending on fluctuations of energy pricing and demand during different periods. Several case studies are solved by GAMS Software to illustrate the performance of the presented model and analyze its sensitivity to the volatility of energy pricing and demand to show their effect on system changeability. An efficient genetic algorithm (GA) has been developed to solve the model in larger scale due to its NP-hardness and compared to GAMS for validation. Results show that the presented GA finds near-optimal solutions in 70% shorter time than GAMS on average.

2014 ◽  
Vol 556-562 ◽  
pp. 6034-6037
Author(s):  
Dong Man Yu ◽  
Zhi Hua Gao ◽  
Xiao Jing Li ◽  
Di Wang

Reconfigurable manufacturing system is essential for sustainable change, rapid response ability important characteristics, research, development and application of manufacturing system. The main architecture and major characteristics of reconfigurable manufacturing systems is explored. Normally, the quality of RMS can be evaluated by several factors. Firstly, the gross cost of production and reconstruction should be less. Secondly, The time of design and manufacture (ascent time) should be shorter. Thirdly, the utilization ratio of existed resource should reach to the utmost. Finally, the cargo stream planning in common space should keep in optimal condition. At last, The author give an example to shown the RMS, the hydraulic integrated package for a gearshift device in automobile, are mentioned to compare and analyze.


Sign in / Sign up

Export Citation Format

Share Document