scholarly journals Tabu Search Algorithm Based on Lower Bound and Exact Algorithm Solutions for Minimizing the Makespan in Non-Identical Parallel Machines Scheduling

2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Mohammed A. Noman ◽  
Moath Alatefi ◽  
Abdulrahman M. Al-Ahmari ◽  
Tamer Ali

Recently, several heuristics have been interested in scheduling problems, especially those that are difficult to solve via traditional methods, and these are called NP-hard problems. As a result, many methods have been proposed to solve the difficult scheduling problems; among those, effective methods are the tabu search algorithm (TS), which is characterized by its high ability to adapt to problems of the large size scale and ease of implementation and gives solution closest to the optimum, but even though those difficult problems are common in many industries, there are only a few numbers of previous studies interested in the scheduling of jobs on unrelated parallel machines. In this paper, a developed TS algorithm based on lower bound (LB) and exact algorithm (EA) solutions is proposed with the objective of minimizing the total completion time (makespan) of jobs on nonidentical parallel machines. The given solution via EA was suggested to enhance and assess the solution obtained from TS. Moreover, the LB algorithm was developed to evaluate the quality of the solution that is supposed to be obtained by the developed TS algorithm and, in addition, to reduce the period for searching for the optimal solution. Two numerical examples from previous studies from the literature have been solved using the developed TS algorithm. Findings show that the developed TS algorithm proved its superiority and speed in giving it the best solution compared to those solutions previously obtained from the literature.

Algorithms ◽  
2020 ◽  
Vol 13 (10) ◽  
pp. 253 ◽  
Author(s):  
Derek H. Smith ◽  
Roberto Montemanni ◽  
Stephanie Perkins

Let G=(V,E) be an undirected graph with vertex set V and edge set E. A clique C of G is a subset of the vertices of V with every pair of vertices of C adjacent. A maximum clique is a clique with the maximum number of vertices. A tabu search algorithm for the maximum clique problem that uses an exact algorithm on subproblems is presented. The exact algorithm uses a graph coloring upper bound for pruning, and the best such algorithm to use in this context is considered. The final tabu search algorithm successfully finds the optimal or best known solution for all standard benchmarks considered. It is compared with a state-of-the-art algorithm that does not use exact search. It is slower to find the known optimal solution for most instances but is faster for five instances and finds a larger clique for two instances.


2009 ◽  
Vol 26 (06) ◽  
pp. 817-829 ◽  
Author(s):  
XIAOFENG HU ◽  
JINGSONG BAO ◽  
YE JIN

This paper focuses on scheduling problem of a pipe-processing flowshop in a shipyard. The flowshop composes of five stages, including cutting, bending, welding preprocessing, argon-welding and CO 2-welding, and each stage consists of identical parallel machines. Since thousands of pipes are mounted on the hull block before erection, the pipe-processing scheduling is a critical task for shipbuilding to meet the due date of the block erection. A tabu search algorithm is developed for the scheduling problem with the objective of minimizing total tardiness. Computational experiments are performed on the collected real data. Results show that the proposed algorithm is efficient for this problem.


2011 ◽  
Vol 59 (11) ◽  
pp. 2955-2963 ◽  
Author(s):  
N. Srinidhi ◽  
Tanumay Datta ◽  
A. Chockalingam ◽  
B. Sundar Rajan

Sign in / Sign up

Export Citation Format

Share Document