scholarly journals Identification of Enabling Factors for Collaboration in Management of Risk in Construction Projects: A Literature Review

Author(s):  
Eng. Philemon, Z. Msomba ◽  
2013 ◽  
Vol 17 (1) ◽  
pp. 21-31 ◽  
Author(s):  
Neringa Gudienė ◽  
Audrius Banaitis ◽  
Nerija Banaitienė

This paper aims to identify a comprehensive list of critical success factors for construction projects in Lithuania. Based on the available literature review, this paper identified 71 success factors under 7 broad groups. Based on the survey results, ten factors including project manager competence, project management team members' competence, project manager coordinating skills, client clear and precise goals/objectives, project value, project management team members' relevant past experience, project manager organising skills, project manager effective and timely conflict resolution, client ability to make timely decision, and project manager experience were determined as the most important success factors for construction projects. These critical success factors are of great significance both to researchers and industry practitioners.


2018 ◽  
Vol 16 (1) ◽  
pp. 25-43 ◽  
Author(s):  
Ayman Ahmed Ezzat Othman ◽  
Nermeen Mohamed Amin Abdelwahab

Purpose The purpose of this paper is to develop a framework integrating risk management (RM) into the architectural design process (ADP) as an approach for delivering sustainable construction projects. Design/methodology/approach A research methodology, which consisted of literature review and field study, is designed to accomplish four objectives. First, to provide a comprehensive literature review of the concepts of sustainability, ADP and RM. Second, to present and synthesis the results of two relevant studies focused on identifying, quantifying and classifying the risks associated with ADP; and investigating the perception and application of Egyptian architectural design firms (ADFs) towards integrating RM into ADP as an approach for delivering sustainable construction projects. Third, to develop a framework that integrates RM into ADP towards delivering sustainable construction projects. Finally, to draw conclusions and recommendations to improve the practice of delivering sustainable construction projects among ADFs, construction professionals and governmental authorities. Findings ADP is a fundamental phase of the construction process because the decisions adopted during this phase affect the project performance throughout its life cycle. While RM is widely applied in different sectors of the construction industry, its application in ADP received scant attention in construction literature. The research identified 18 key risks that affect the sustainable delivery of construction projects during ADP. The architect, the client and the project manager are the highest ranked responsible parties for the occurrence of these key risks. The field study highlighted the need to develop a framework to facilitate integrating RM into ADP. Research limitations/implications This paper focused only on the integration of RM into ADP. Originality/value The conducted literature review and field study provided an in-depth understanding of the key risks that affect the sustainable delivery of construction projects during ADP. Through its five stages, the proposed framework is expected to serve as a foundation for integrating RM into ADP as an approach for delivering sustainable projects. This ideology has received scant attention in construction literature. The developed framework represents a synthesis that is novel and creative in thought and adds value to the knowledge in a manner that has not previously occurred.


2020 ◽  
Vol 47 (2) ◽  
pp. 118-131
Author(s):  
Danilo Gomes ◽  
Patricia Tzortzopoulos

Collaboration is essential for the success of construction projects. However, the concept of collaboration is unclear, and the term is often related to different meanings. Construction research defines collaboration in different ways, having been influenced by other research fields (e.g., social sciences and philosophy). This paper discusses existing definitions of collaboration and how they relate to three perspectives on the nature of collaborative interactions, linked to organisational metaphors. The research was developed through a literature review, including the conceptual analysis of existing definitions of collaboration. The discussion proposes that metaphors not only describe collaboration ontologically, but also establish different appreciative systems by which individuals conceive and evaluate their collaborative performance. The aim of this discussion is to address the lack of consistency in defining collaboration in construction, embracing the coexistence of interpretations. This can help researchers and practitioners understand how to overcome misunderstandings and explore initiatives to improve collaboration.


2021 ◽  
Vol 9 (3) ◽  
pp. 52-57
Author(s):  
Yasir Mohamed Hassan Amin ◽  
Mohamed Abdulla Nugdalla Ahmedi

Quality management is considered one of the most important obstacles facing the construction industry in Sudan. The application of a quality assessment system contributes to the development of quality in projects as it is possible to measure the quality in projects. This paper aims to introduce one of the quality assessment systems, which is the system followed and applied in the Singapore (CONQUAS). This system assesses quality based on structural, architectural, mechanical and electrical work. The paper also aims to study the factors affecting the application of the quality assessment system in Sudan. The study is carried out in the region of Khartoum. The study is focusing on the construction projects. The study is carried out by questionnaires and other literature review. The respondents are consultants and contractors. The data has been distributed and analyzed by using the Average Index. From the study it was found that CONQUAS standard is assessed the building based on workmanship standards by the assessors from the BCA on site using standard score sheets. The assessment is done throughout the construction process for structural, mechanical and electrical works, and from questionnaire results the main factors affect construction industry in Sudan is lack of standardization in Sudan. The author recommended that more study shall be conducted to identify factors affecting quality in Sudanese construction industry and how to improve the quality.  


Author(s):  
Samiullah Sohu ◽  
Abdul Fattah Chandio ◽  
Kaleem ullah

The problem of delay in construction industry is a regular phenomenon worldwide, and construction industry of Pakistan has no exception, particularly in highways projects. Delay can be described as the extension of time to complete the construction project. The aim of this paper is to identify main causes of delays in highway projects of Pakistan, and to determine mitigating measures for the identified causes. The research method of this study is based on literature review, questionnaire survey and semi structured interview. From in-depth literature review, twenty-six common causes of delay were found. A questionnaire survey was carried out among construction professionals of highway projects. The causes of delay in highways projects were ranked referring to their Mean values. A semi structured interview was carried out to determine mitigation measures for the top ten causes of delays. The data gathered from questionnaire survey was analyzed using SPSS (Statistical Package for the Social Sciences) while, data collected through semi structured interviews was analyzed using Nvivo software. The findings of this study are expected to be useful for construction parties, to mitigate the delays in highway construction projects of Pakistan.


2019 ◽  
Vol 6 ◽  
pp. 238212051984940 ◽  
Author(s):  
Megan EL Brown ◽  
Kevin Anderson ◽  
Gabrielle M Finn

Hailed by supporters as the answer to many challenges facing medical schools and the wider health care system, longitudinal integrated clerkships (LICs) offer a practical and sustainable alternative to more traditional block rotational models. Given this, their popularity as a curricular measure is increasing, although such clerkships remain relatively novel within the United Kingdom. This narrative literature review of international work provides a comprehensive introduction to developing and implementing LICs within medical education. This review generates a practical guide for medical educators with a focus on the development and implementation of LICs within the United Kingdom, on which there is little work. Using illustrated examples and with reference to contemporary literature, it outlines the rationale for considering an LIC within a curriculum, the different types of LIC, barriers and enabling factors to LIC implementation and considers the contemporary application of LIC models within the United Kingdom. The practical guide details key questions educators must consider when developing and implementing an LIC, particularly within the landscape of UK medical education.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Qian Chen ◽  
Daniel Mark Hall ◽  
Bryan Tyrone Adey ◽  
Carl Thomas Haas

PurposeManaging stakeholders' reciprocal interdependencies is always a challenging issue. Stakeholders need to find out different ways to communicate information and coordinate material flows during the supply chain processes. Many recent studies have advanced construction supply chain coordination from multiple perspectives. However, the field still lacks a comprehensive analysis to summarize existing research, to explicitly identify all the possible enablers for coordination and to investigate how the enablers can be carried out at the supply chain interfaces. To fill the gap, this study aims to conduct a systematic review in order to examine the relevant literature.Design/methodology/approachA systematic literature review process was conducted to identify and synthesize relevant publications (published in the past 20 years) concerning the coordination of construction supply chain functions. These publications were coded to link main research findings with specific enabler categories. In addition, how these enablers can be used at the interfaces across supply chain processes was reviewed with an in-depth analysis of reciprocal communications between stakeholders at design-to-production, production-to-logistics and production-to-site-assembly phases.FindingsThe coordination enablers were classified into three categories: (1) contractual enablers (including subtopics on relational contracts and incentive models), (2) procedural enablers (including subtopics on multiagent knowledge sharing systems and the last planner system) and (3) technological enablers (including subtopics on linked databases for design coordination, design for manufacturing software platforms and automated monitoring technologies). It was found that interfacing different functions requires a certain level of integration of stakeholders for quick response and feedback processes. The integration of novel contractual forms with digital technologies, such as smart contracts, however, was not adequately addressed in the state of the art.Research limitations/implicationsThe scope of the systematic review is limited to the static analysis of selected publications. Longitudinal studies should be further included to sharpen the inductions of enablers considering organizational changes and process dynamics in construction projects.Practical implicationsDifferent enablers for coordination were summarized in a concise manner, which provides researchers and project stakeholders with a reinforced understanding of various ways to manage reciprocal interdependencies at different supply chain interfaces.Originality/valueThis study constitutes an important input for research on the construction supply chain by illuminating the thematic topic of coordination from inductively developed review processes, which included a holistic framing of the emerging coordination enablers and their use across supply chain functions. Consequently, it closes some identified knowledge gaps and offers additional insights to improve the supply chain performance of construction projects.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Sam Fernando ◽  
Kriengsak Panuwatwanich ◽  
David Thorpe

PurposeThis study aims to investigate and model the complex dynamics of innovation enablers in construction projects aiming to develop a framework identifying actions for clients to promote innovation.Design/methodology/approachThrough a comprehensive literature review, a conceptual model was previously derived to explain the client-driven enablers in promoting innovation. This was tested using the data from 131 Australian construction projects. Statistical analysis was conducted on the data using factor analysis and correlation analysis to test the model, which was validated using the case study approach. The testing and validating aspects are explained in this paper.FindingsThe constructs of the recommended model are idea harnessing, relationship enhancement, incentivization and project team fitness.Research limitations/implicationsThe difficulty of analyzing the complex dynamics happening within projects in relation to innovation has been a barrier to progress research in this area. The introduction of this model would pave the way for researchers to explore this area with ease.Originality/valueAs revealed in the detailed literature review undertaken, this is the first time that a comprehensive study has been conducted to identify client-led innovation enablers for construction projects. The results would benefit industry practitioners to achieve enhanced project outcomes in construction projects through innovation.