scholarly journals Development of Ontology for Semantic Structure of Strategic Alignment Framework for IT Projects Combining PMBOK, PMI and VAL IT

2021 ◽  
Vol 14 (5) ◽  
pp. 458-468
Author(s):  
Lamia Moudoubah ◽  
2004 ◽  
Author(s):  
Marc W. Howard ◽  
Aditya V. Datey ◽  
Hong-Liang Gai
Keyword(s):  

2010 ◽  
Vol 3 (2) ◽  
pp. 181-204 ◽  
Author(s):  
Maria Rosenberg

This study addresses agentive nominal compounds in French and Swedish containing N and V constituents. French has only one such compound, VN, whereas Swedish has at least four, NV-are, NV-a, NV and VN. The study explores the semantic characteristics of their constituents and their semantic structures. Formal aspects are also considered within a lexeme-based morphology. The analysis shows that, although French and Swedish compounds differ formally, they share more or less the same semantics. Their V constituent takes one or more arguments, and their N constituents display several semantic roles. Semantically, the compounds generally denote an Actor of verbs taking two arguments, and the N constituents denote an Undergoer, except in Swedish VN compounds, which denote an entity which fills the same role as that of the N constituent, generally an Actor. Non argumental interpretations, such as Place or Event, are less frequent. In conclusion, the study can have typological value for the semantics of agentive nominal compounds.1


Author(s):  
Olga Olegovna Eremenko ◽  
Lyubov Borisovna Aminul ◽  
Elena Vitalievna Chertina

The subject of the research is the process of making managerial decisions for innovative IT projects investing. The paper focuses on the new approach to decision making on investing innovative IT projects using expert survey in a fuzzy reasoning system. As input information, expert estimates of projects have been aggregated into six indicators having a linguistic description of the individual characteristics of the project type "high", "medium", and "low". The task of decision making investing has been formalized and the term-set of the output variable Des has been defined: to invest 50-75% of the project cost; to invest 20-50% of the project cost; to invest 10-20% of the project cost; to send the project for revision; to turn down investing project. The fuzzy product model of making investment management decisions has been developed; it adequately describes the process of investment management. The expediency of using constructed production model on a practical example is shown.


Sign in / Sign up

Export Citation Format

Share Document