scholarly journals SCHEDULING WORK UNDER INTEGRATED URBAN DEVELOPMENT USING THE METHOD OF UNCERTAIN RESOURCE COEFFICIENTS

2021 ◽  
Vol 6 (4) ◽  
pp. 34-41
Author(s):  
Sergey Bolotin ◽  
◽  
Haitham Bohan ◽  
Aldyn-kys Dadar ◽  
Khenzig Biche-ool ◽  
...  

Introduction: Planning integrated development of a residential area involves determining the composition of the objects to be built and creating an appropriate integration mechanism, backed up by a generalized work schedule. The existing methods of forming integrated work schedules do not use a systemic approach, based on a universal mathematical model, to describe the organizational and technological aspects of construction. Methods: The present study uses the method of uncertain resource coefficients to demonstrate a mechanism for systemically describing organizational and technological construction processes. We present a way of adapting this method to forming a generalized construction schedule during integrated development. The proposed adaptation mechanism is based on managing schedule calculations by rationally influencing the elements of the linear equation system that describes the organizational and technological processes. Results and Discussion: The solutions presented in the paper are fully consistent with the calculations obtained by different flow methods of organizing construction, as well as with the critical path method used in project management programs. The method described in the paper has been implemented in well-known project management software, Microsoft Project, as a macro program in the Visual Basic for Applications programming language, making it possible to form, calculate, and optimize a schedule for integrated territory development using the unified software toolkit.

Author(s):  
Jerry M. Hopwood ◽  
Ian J. W. Love ◽  
Medhat Elgohary ◽  
Neville Fairclough

Atomic Energy of Canada Ltd. (AECL) has very successful experience in implementing new construction methods at the Qinshan (Phase III) twin unit CANDU 6 plant in China. This paper examines the construction method that must be implemented during the conceptual design phase of a project if short construction schedules are to be met. A project schedule of 48 months has been developed for the nth unit of NG (Next Generation) CANDU with a 42 month construction period from 1st Concrete to In-Service. An overall construction strategy has been developed involving paralleling project activities that are normally conducted in series. Many parts of the plant will be fabricated as modules and be installed using heavy lift cranes. The Reactor Building (RB), being on the critical path, has been the focus of considerable assessment, looking at alternative ways of applying the construction strategy to this building. A construction method has been chosen which will result in excess of 80% of internal work being completed as modules or as very streamlined traditional construction. This method is being further evaluated as the detailed layout proceeds. Other areas of the plant have been integrated into the schedule and new construction methods are being applied to these so that further modularization and even greater paralleling of activities will be achieved. It is concluded that the optimized construction method is a requirement, which must be implemented through all phases of design to make a 42 month construction schedule a reality. If the construction methods are appropriately chosen, the schedule reductions achieved will make nuclear more competitive.


Author(s):  
Emmanuel Diacos

Patrick Stevedores’ Port Botany Container Terminal is located 10km south of the city of Sydney, NSW, Australia. The Terminal is currently undertaking the challenging process of expansion and automation while causing minimal impact to existing operations. This $350 million project includes the automation of the container straddles. As part of the Port Botany Terminal upgrade, a new entrance over the existing rail sidings has been created called Ramp D. Ramp D had to be open to traffic by April 2014 to not delay the commencement of automated straddle operations planned to commence in July 2014. This resulted in a tight construction schedule. With a congested and shared construction site the options for accelerating the programme were limited. As the client’s representative, the role was to facilitate the execution of the project. By careful scheduling, the use of extended working hours to reduce the critical path, and close cooperation by all stakeholders, the target was met.


Author(s):  
Dae-Yul Jung ◽  
Yoon-Kee Kang ◽  
Chang-Hyung You

This paper covers advanced construction technologies that are generally used for nuclear power plants and presents advanced construction methods that can contribute to an efficient and short construction schedule. The construction schedule is driven by the activities of the critical path. The advanced construction methods consist of Modularization, Improvement of Mechanical Rebar splices, Application of 3D-CAD system for information and control, and the installation of RVI and RCL at the same time. Some methods have been applied in actual Nuclear power projects and others have been developing under the research and development program. It incorporates the experiences and insights from recent nuclear construction projects all over the world.


2016 ◽  
Vol 78 (8-2) ◽  
Author(s):  
Norma Alias ◽  
Nadia Nofri Yeni Suhari ◽  
Hafizah Farhah Saipan Saipol ◽  
Abdullah Aysh Dahawi ◽  
Masyitah Mohd Saidi ◽  
...  

This paper proposed the several real life applications for big data analytic using parallel computing software. Some parallel computing software under consideration are Parallel Virtual Machine, MATLAB Distributed Computing Server and Compute Unified Device Architecture to simulate the big data problems. The parallel computing is able to overcome the poor performance at the runtime, speedup and efficiency of programming in sequential computing. The mathematical models for the big data analytic are based on partial differential equations and obtained the large sparse matrices from discretization and development of the linear equation system. Iterative numerical schemes are used to solve the problems. Thus, the process of computational problems are summarized in parallel algorithm. Therefore, the parallel algorithm development is based on domain decomposition of problems and the architecture of difference parallel computing software. The parallel performance evaluations for distributed and shared memory architecture are investigated in terms of speedup, efficiency, effectiveness and temporal performance.


Author(s):  
Jose Finocchio Junior ◽  
Marcelo Ramos Martins

The present study discusses the adequacy of the Critical Chain Project Management Method (CCPM) — also known as the Critical Chain Method — for scheduling projects involving shutdowns on oil platforms, as such projects involve decision-making processes under risk conditions. The CCPM is based on the Theory of Constraints and aims at providing more precise and more clearly focused control instruments than those traditionally used in the Critical Path Method (CPM). The CCPM also indicates the best moments to act and where and how the action should be directed. The hypothesis underlying the research is that the CCPM portrays, more adequately than the CPM, the uncertainty that exists in a platform shutdown. This characteristic also makes it possible to draw up a schedule that is both more realistic and more challenging, as it addresses the goal of causing less interruption of production. On the basis of this hypothesis, the two main questions that oriented the entire investigation were: 1) Is the CCPM suitable for scheduling the shutdown of an offshore oil platform and, 2) What advantages might it have over the traditional methods in use? To answer these questions the authors reviewed the existing bibliography on the topic and made direct on-site observations during an actual shutdown. In addition, interviews were held with a number of specialists in the area using qualitative approaches, namely, semi-structured interviews, focus groups, and action research.


2013 ◽  
Vol 405-408 ◽  
pp. 3423-3428
Author(s):  
Zhao Lin Li ◽  
Guo Zhi Zhang

Schedule control is the major issue in project management, and to predict the construction schedule effectively is important practically. The article mainly predicts the schedule of a project based on BP neural network. The result shows that the predicted value is more accurate than the value calculated by linear method.


2021 ◽  
Vol 1 (1) ◽  
pp. 119-123
Author(s):  
Nurhayati Abbas ◽  
Nancy Katili ◽  
Dwi Hardianty Djoyosuroto

This research is motivated by the lack of mathematics teaching materials that can make students learn on their own. The teaching material can be created by teachers as they are the ones who possess the knowledge about their students’ characteristics. Further, learning materials are a set of materials (information, tools, or texts) that can aid teachers and students to carry out the learning process. The two-variable linear equation system (SPLDV) is one of the mathematics materials taught to eighth-grade students of junior high school; it contains problems related to daily life. However, it is found that this material is still difficult to master by most students. Therefore, it is necessary to develop the SPLDV teaching materials that can help students learn and solve problems as well as be used as examples by teachers in developing other materials. This research aimed to make problem-based SPLDV teaching materials. The research method refers to the Four-D Model by Thiagarajan, Semmel, and Semmel (1974). It consisted of defining, designing, developing, and disseminating. The results showed that problem-based SPLDV teaching materials could be used in learning activities as the students and the teachers had shown their positive responses after going through expert assessments. This study also suggested that the teachers use this teaching material and adopt teaching materials for other similar materials.