On the Need to Revise the Rules for the Protection of Structures and Natural Objects from the Harmful Effects of Mining

Author(s):  
S.B. Kulibaba ◽  
◽  
E.V. Fedorov ◽  

Conditions for the coal extraction under the built-up areas and natural objects in the Russian Federation are fully regulated by the Rules for the protection of structures and natural objects from the harmful effect of the underground mining at the coal deposits. Determination of the degree of danger of effecting mining operations on these objects, and the choice of measures for their protection are carried out based on the calculation of the earth surface deformations. The purpose of the work is to develop proposals for the modernization of the current regulatory and methodological document based on the analysis of the compliance of its provisions with the modern conditions of the deposits underground mining. Experience of applying the document under consideration in the modern conditions of the development of coal deposits showed that many of its provisions contain a number of inaccuracies, in particular: ambiguity in determining the boundaries of the zone of dangerous influence of the underground mining; lack of a methodology for predicting the period of damping of the process of earth surface damage after stopping the working face; limited conditions for determining the standard deformation indicators for civil buildings, etc. In addition, in this document, only the underground method of mining coal seams is considered, while the more promising is a combined development, combining underground and open-pit methods. The problem of inconsistency of the current rules provisions with the modern conditions can have a very negative effect on the safe state of the undermined objects. Based on the analysis of the identified shortcomings, a number of proposals for improving the rules was developed. In particular, it was proposed to expand them by including the rules and regulations of the combined method of deposits development. It is also required to update the normative and methodological parts of the document bringing them in line with the modern conditions of deposit development considering the accumulated experience of the objects undermining, and the results of the latest studies of rock mass deformation.

2021 ◽  
Vol 303 ◽  
pp. 01059
Author(s):  
Vladimir Makarov ◽  
Valery Kolesnikov ◽  
Dawid Szurgacz

At the present time on the fields of operating and closed-down mines there are sections of open-pit operations. However, the adopted technology does not meet environmental requirements, there are no scientific recommendations on the technology of open-pit mining in hazardous areas of mine fields, there is no substantiation of the boundary contours of open-pit mining. A characteristic feature of depleted mine fields is the disturbed rock mass and the lack of concentrated coal reserves within their boundaries. In fact, coal reserves are represented in the form of fragmentary volumes of safety pillars and substandard reserves in places of geological disturbances. Limitation of mine fields in terms of various infrastructure objects imposes special requirements for mining operations. In these conditions it is not possible to apply the classic mining systems and technologies. This predetermines the necessity to develop new technological solutions. Therefore, scientific research on justification of technology for extraction of remaining reserves of coal after underground development of inclined and steep-sloping coal deposits with simultaneous reclamation of disturbed lands is actual.


2019 ◽  
Vol 105 ◽  
pp. 02006
Author(s):  
Tatiana Gvozdkova ◽  
Pawel Stefanek ◽  
Michaela Koščová

Ecological problems in the open pit mining of coal deposits are extremely hard, since mining operations are accompanied by disturbed land to a large depth with significant changes in the landscape, hydrometeorological conditions, mixing of rocks and removal of infertile or even harmful rocks with radioactive isotopes to the surface. Disturbed lands are unusable if they are not repaired. All man-made disturbances of the environment caused by open pit mining are divided into landscape (changes in terrain, vegetation and soil cover) and environmental (violation of living conditions within the allotment and adjacent lands: changes in water regime, pollution of the soil, air and water basins) onesOne of the most important areas in the field of environmental protection is the reclamation (restoration) of the earth’s surface. In accordance with the requirements of the protection of the subsoil, enterprises engaged in the development of mineral deposits are obliged at their own expense to bring disturbed lands into a state suitable form for their further use. Reclamation of ought to be carried out during open pit mining operations and must be completed after mining of mineral resources in the terms established by the authorities that provide land for use.


2021 ◽  
Vol 303 ◽  
pp. 01029
Author(s):  
Alexander Katsubin ◽  
Victor Martyanov ◽  
Milan Grohol

Information about the geological structure of Kuznetsky coal basin (Kuzbass) allows us to note that coal deposits developed by open-cast method are characterized by complicated conditions and have the following features: large length of deposits at significant depths of occurrence; coal series bedding of different thicknesses (from 1 to 40 m); different dip angles (from 3 to 90º); a significant number of dip and direction disturbances; different thickness of unconsolidated quaternary sediments (from 5 to 40 m); a wide range of strength values of rocks. In addition, there is a thickness irregularity and frequent variability of elements of occurrence of coal seams within the boundaries of a quarry field both in length and depth of mining. From the point of view of open-pit mining, such deposits are complex-structured. The factors listed above have a decisive influence on the choice of technical means, the order of development and the possibility of carrying out surface mining operations. Therefore, there is a need for a systematization of mining and geological conditions for the development of coal deposits, the purpose of which is to ensure a process of evaluation of complex-structured coal deposits for the development of coal-bearing zones by various complexes of equipment.


Author(s):  
V.N. Tyupin ◽  

At present, to ensure seismic safety in massive explosions, the analytical dependence of the determination of the vibration velocity of M.A. Sadovsky rock mass is mainly used. This dependence is widely used in the creation of seismic-safe technologies for mineral deposits open-pit and underground mining. However, scientific research and production experience showed that the rate of oscillation depends on the energy parameters of the explosive, the diameter and length of its charges, the number of simultaneously exploded charges, the number of deceleration stages, the deceleration interval, etc. The purpose of this article is to predict the speed fluctuations of the massif on the earth surface when conducting the underground explosions depending on the parameters of large-scale explosions and physical-technical properties of the rock masses in the areas of explosion of the protected object. The formulas for calculating the velocity of rock mass on the earth surface during large-scale explosions in the underground conditions are substantiated and presented. The formulas were used for calculating the vibration velocities of the rock mass on the earth surface in accordance with the parameters of drilling and blasting operations during large-scale explosions in the mines of GK VostGOK. Comparison of theoretical (calculated) data and the results of actual measurements indicates their convergence. By changing the controlled parameters in the calculation formulas, it is possible to quantitatively reduce the seismic effect of a large-scale explosions on the protected objects. Further research will be aimed at studying the influence of tectonic faults, artificial contour crevices, filling massif or mined-out space on the rate of seismic-explosive vibrations during blasting operations in the mines. The research results can be used in the preparation of rules for conducting large-scale explosions at the underground mining.


2021 ◽  
Vol 315 ◽  
pp. 01006
Author(s):  
Tatiana Tyuleneva ◽  
Roman Shishkov ◽  
Elena Kucherova ◽  
Marat Moldazhanov

In recent years, there has been a decline in the efficiency of coal mining by traditional methods. On the one hand, the volume of coal outside the contour of the cut, which is economically impractical for open-pit mining, is increasing. On the other hand, when using underground geotechnology, the cost of production exceeds the cost of performing mining operations using open geotechnology, this is due to differences in the factors of operation of the open pit and the mine. This circumstance determines the use of open-underground technology for mining coal reserves outside the contour of the open pit as an actual and promising direction. This article describes a methodological approach based on the use of technological schemes for the preparation and treatment of reserves of powerful shallow coal seams, the justification of the parameters of combined geotechnology with a coordinated and balanced development of open and open-underground mining operations with the distribution of reserves for open and open-underground mining of coal reserves beyond the limit contour of the open pit, the preparation of excavation sites directly from its workings and the coordination of production capacity and the speed of their development. Its application will increase the production capacity of the coal mining complex without additional environmental burden and will provide an increased return on investment.


2018 ◽  
Vol 41 ◽  
pp. 01044
Author(s):  
Viktor Fedotenko ◽  
Ekaterina Esina

One of the most promising areas of increasing the open mining efficiency with the methods reducing the negative impact on the environment is the use of high overburden benches, including those on the basis of the stripping system with overburden transport. The use of high overburden benches in the open mining of steep and steeply dipping deposits ensures the growth of the completeness the deposit's reserves mining while simultaneously increasing the safety and efficiency of open mining operations and reducing the surrounding environmental impact. The justification of the parameters and the technology of an effective transition to the high bench stripping of thick coal deposits is performed. It is proved, that the transition to high overburden benches in the period of maximum development of mining operations provides the increase in the volume of additional recoverable mineral resources by 18-23% corresponding to the increase in the depth of the open pit mine and the period of its operation. At the same time, the length of transport routes and communications is reduced to 15%, as well as the number of transport equipment and the time for the transfer of machinery and equipment.


2021 ◽  
Vol 44 (4) ◽  
pp. 358-368
Author(s):  
B. L. Talgamer

It is in 1930 that the training of mining engineers began in Eastern Siberia on the basis of the Siberian Mining Institute (now Irkutsk National Research Technical University). In 1931 the Department of Mining Arts was organized, which later was named the Department of Mineral Deposits Development. Over the years, the Department has trained more than 7000 graduates – mining engineers, who made a huge contribution in the development of the mining industry in the Irkutsk region and neighboring territories including Mongolia. The Department has trained more than a hundred mining engineers and Masters of science for Mongolia; assisted the lecturers and professors of the Mongolian Polytechnic University (now Mongolian University of Science and Technology) in organizing the educational process for training specialists for the country's mining industry. At its different formation stages the Department of Mineral Deposits Development was headed by well-known scientists – mining engineers, who created three scientific schools for the development of coal, placer and gold deposits; the obtained scientific results were marked with two State awards of the Russian Federation, dozens of doctoral and candidate dissertations were defended and about 100 patents were received. Today, the Department super- vises the training of mining engineers in open-pit and underground mining of mineral deposits, carries out a large amount of research and design work on the orders from mining enterprises, trains academic staff, develops new technologies and technical solutions in order to improve mining operations. The Department is deeply involved in the cooperation with mining enterprises, research and design organizations, as well as with universities that train mining engineers.


2021 ◽  
pp. 43-47
Author(s):  
K. Sanakulov ◽  
N. P. Snitka

The international geological community has acknowledged Muruntau gold deposit as the greatest discovery in the mid-to-late 20th century. Muruntau mine field holds the total appraised resource potential of more than 4.5 thousand tons of gold. Hydrometallurgical plant GMZ-3 implements gold-ore processing by gravitational sedimentation and adsorption. The technological and instrumental modernization of the gold processing circuit toward its higher capacity, gold recovery and thoroughness are the important aspects of production improvement and cost reduction. The developed and introduced ore milling flowchart provides replacement of the second milling stage pumps by higher-capacity pumps backed up with additional cyclones. Aiming to ensure stable gold production at plants GMZ-2 and GMZ-3, Navoi MMC’s experts accomplished the feasibility study of mining operations in Chukurkuduk and Turbai deposits in 2020. The growth prospects for open pit mining in Murunatu–Myutenbai fields after 2060 are estimated using the model of optimized ultimate pit limit design at the gold price of USD 1500/t. The model ultimate pit limit embraces all probable reserves as per the detailed 2D seismic data as of early 2020, including proven reserves intended for open pit and underground mining. The gold ore appraisal and the expansion program elaborated for Muruntau gold mining and refining integrated works in joint Muruntau–Myutenbai field, through implementation of operation phases V and further make it possible to forecast stable performance up to 2030–2050.


2018 ◽  
Vol 41 ◽  
pp. 01031 ◽  
Author(s):  
Alexei Selyukov ◽  
Peter Blištan ◽  
Stanislav Jacko ◽  
Viliam Bauer

The mining science, unlike many other technical sciences, studies the processes that occur not in one place, but in moving faces. The primary task is to analyze the influence of the various factors defining the parameters of the quarry operational area and to define a possibility of mining operations’ concentrating on the individual sections of the quarry, taking into account their further development downdip and in-depth. The intensity of their movement depends on the surface and on the excavating equipment capacity. The development of open pit mining area in time and space is subject to certain rules. Thus, the initiating works providing the access to the deposit should be ahead of the work on the preparation of excavation blocks, and the latter coal extraction. The intensity of the implementation of this works is also associated with certain patterns of the quarry working area development. The article describes the calculation method for determining the cyclical size of the working area, as a function of some key points: the time of working area development; its speed vector; the direction of the depth of mining and the quarry field area.


Sign in / Sign up

Export Citation Format

Share Document