scholarly journals Analysis and Simulation of Current Zero Crossing Time Interval Under Different Loads

Author(s):  
I Wayan Sutaya ◽  
Ketut Udy Ariawan ◽  
I Gede Nurhayata
2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Pitri Bhakta Adhikari ◽  
Aashutosh Adhikari

We have analyzed the breakdown pulse train with or without the main event in this paper. Among the selected 81 flashes, 36 flashes are starting positively, and 45 are starting negatively. Also, 58 flashes contain positive pulses, and 67 flashes contain negative pulses, whereas 44 flashes contain both positive and negative pulses. Among these 81 flashes, 22 flashes follow the main events, and the rest are isolated events. In this study, we got the main duration of PB pulses as 1.94 ms and the time interval between the breakdown pulse and return stroke as 61.49 ms. On taking each pulse train, we found the rise time to be 2.6 μs, zero-crossing time 14.95 μs, and the time interval between pulses 199.3 μs. The largest pulse amplitude ratio in the preliminary breakdown pulse to the main event return stroke was 0.43.


2012 ◽  
Vol 562-564 ◽  
pp. 1531-1536
Author(s):  
Ming Xing Zhu ◽  
Jing Bo Shi

In the inverter control system, two-phase modulated space vector pulse width modulation (SVPWM) algorithm has the advantages of minimum switch loss and higher utilization of direct current (DC) bus voltage. Non-dead-time control strategy can eliminate the problems of the dead time effects. But the traditional non-dead-time control strategy heavily depends on the current zero-crossing detection, which may cause the output voltage distortion or even a short circuit. Based on the analysis of the reason for the distortion, a new optimized non-dead-time control method is proposed. Two methods for the detection of the overlapping area are enumerated. The conclusions are confirmed by the simulation results with MATLAB/ SIMULINK.


2017 ◽  
Vol 45 (12) ◽  
pp. 1329-1338 ◽  
Author(s):  
Kuo-Ing Hwu ◽  
Wen-Zhuang Jiang

Author(s):  
Muhammad Akmal Bahari ◽  
Zikri Abadi Baharudin ◽  
Tole Sutikno ◽  
Ahmad Idil Abdul Rahman ◽  
Mohd Ariff Mat Hanafiah ◽  
...  

The mechanism on how lightning detection system (LDS) operated never been exposed by manufacturer since it was confidential. This scenario motivated the authors to explore the issue above by using MATLAB to develop autoanalysis software based on the feature extraction. This extraction is intended for recognizing the parameters in the first return stroke, and compare the measurement between the autoanalysis software and the manual analysis. This paper is a modification based on a previous work regarding autoanalysis of zero-crossing time and initial peak of return stroke using features extraction programming technique. Further, the parameter on rising time of initial peak is added in this autoanalysis programming technique. Finally, the manual analysis using WaveStudio (LeCroy product) of those two lightning parameters is compared with autoanalysis software. This study found that the autoanalysis produce similar result with the manual analysis, hence proved the reliability of this software.


2014 ◽  
Vol 532 ◽  
pp. 62-69
Author(s):  
Yi Chuan Gao ◽  
Guo Chang Liu

A novel actuator controller for greenhouse control system is proposed in this paper. This controller can solve the problems existing in traditional greenhouse control system such as generating electric arc, short circuit risk, lack of communication and smart ability. We adopt five separate magnetic latching relays to control the three-phase motor. In order to prevent generating electric arc in the process of turning off relay, the alternating current zero-crossing detection circuit is designed. In software side, the relay-off task program is running in the real-time operating system, which can ensure turn-off operation at the point of alternating current zero-crossing. In addition, the controller is capable of detecting motors operation parameter and having multiple communication interfaces. Finally, we implement our controller in practice and experimental results meet the design requirements.


Geophysics ◽  
2015 ◽  
Vol 80 (5) ◽  
pp. N23-N35 ◽  
Author(s):  
Guofa Li ◽  
Mauricio D. Sacchi ◽  
Yajing Wang ◽  
Hao Zheng
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document