scholarly journals Beyond Letter Grades: A Case Study in Developing an Evaluation System to Generate Project Performance Transcripts

Author(s):  
Ji Won You ◽  
Yoonsook Chung

Traditional academic transcripts are usually restricted to demonstrating stu-dents’ achievements and experiences during college life. As an example of extended transcripts, this study aims to introduce the development process behind an end-user product for a project performance evaluation system (PPES), which supports conducting project performance evaluations and generates project performance transcripts at a university. The first part of the study described the design process of the PPES. A user group of instructors, which continuously provided feedback on the prototype design, was formed. Consequently, the PPES was successfully developed and several main inter-faces of the PPES were presented. The second part of the study analyzed user satisfaction with the PPES and the project performance transcripts it pro-duced. In general, students perceived the project performance transcripts positively, and instructors were satisfied with both the PPES and its tran-scripts. The implications of developing a project performance evaluation sys-tem were discussed.

2002 ◽  
Vol 31 (2) ◽  
pp. 141-159 ◽  
Author(s):  
Bonnie G. Mani

One would expect a valid, reliable performance evaluation system to give employees and managers data about employees' strengths and needs for development. If these data are used to reinforce employees' strengths and to plan and provide developmental assignments in areas of need, then one might also expect improvements in morale, motivation, and productivity. This paper explores employees' and administrators' perceptions of a system with these goals, a system specifically designed to appraise performance of North Carolina “Subject to the Personnel Act” (SPA) employees at East Carolina University. The data show that a large proportion of employees, but no supervisors, are dissatisfied with the system; that neither the number of subordinates nor the time spent evaluating employees under the system affects supervisors' satisfaction with the system; and that employees' perceptions of the fairness of the system is related to trust and satisfaction with their supervisors but not with compliance with the program's procedures. Although various factors motivate employees and supervisors, pay is very important. So the legislature's failure to appropriate funds to reward employees who excel undermines the system's effectiveness. There is a need for further research to explore the relationships between employees' ratings and their race and sex. Introduction


2012 ◽  
Vol 518-523 ◽  
pp. 2104-2108
Author(s):  
Chang Ping Qian ◽  
Yao Long Liu ◽  
Jun Wang ◽  
Zhen Lou Chen

Integrated with the project performance research development in the world, this article structures a performance evaluation system which accords with the urban rivers pollution characteristics and the treatment project performance in the south city of China. With an empirical study on the treatment project of the Panlongjiang River in Nanba Village of Kunming City, this article evaluates the treatment projects from the aspects of social economic profit, ecological benefit and the social benefit for people’s livelihood. The evaluation result shows that the treatment project on the part of Panlongjiang River in Nanba Village of Kunming City works effectively. The investment and income, the benefit of projects and the river environmental quality belong to the level of very efficient. The pollution emission reduction benefit, the ecological quality of riparian zone landscape, aquatic environment condition, and the development of basic establishment belong to the level of efficient. The environmental protection and management performance belongs to the level of ordinary. The practice demonstrates that this evaluation index system has certain serviceability and can reflect the process and the real achievements of treatment projects of black color and odor urban rivers.


2018 ◽  
Vol 11 (4) ◽  
pp. 219-229
Author(s):  
WORKU MEKONNEN TESSEMA

In this research a developed web–based balanced scorecard performance evaluation system proposed for the case study of Ethiopian organizations and supports both English and Amharic languages. The system incorporates evaluations of individual performance (both in activity and behavior), major activity performance, objective performance, perspective performance, unit/ department performance, and the organization/institute as a whole based on time, cost, quality and quantity. Object oriented software engineering and ASP.NET 4.0 platform is employed to develop the system. Reviewing the overall results from the usability test, questionnaires and interviews, it is concluded that all production and extensive public service providing organizations prefer to use the implemented application but other organizations comparatively didn’t want to use it as it seems it doesn’t facilitate their daily duties. But the overall functionality of the system is being agreed by the users.


Energies ◽  
2019 ◽  
Vol 12 (24) ◽  
pp. 4620 ◽  
Author(s):  
Cynthia Changxin Wang ◽  
Samad M.E. Sepasgozar ◽  
Mudan Wang ◽  
Jun Sun ◽  
Xin Ning

The location of temporary facilities in a construction project and the entire site layout plan directly affect project objectives such as time, labor cost, and material transportation and handling. The layout of construction sites also affects entrainment factors such as energy consumption, carbon footprints, and overall construction operation productivity. While site layout planning has been intensively investigated from a project objectives perspective, there have been very few studies of energy-efficiency-based planning, or of the sustainability performance of site layouts. This study developed a green performance evaluation system aimed at improving the sustainability of construction site layouts. The identified factors include six sustainable evaluation categories covering energy conservation and environmental protection, people-oriented principles, construction efficiency, intensity of economic growth, intensity of space use, and the overall control of process. An analytic hierarchy process (AHP) was adopted to determine the weight of each attribute and a fuzzy comprehensive evaluation method was established to carry out the evaluation. The 23 attributes adopted in this paper were identified in the literature; however, the major contribution of this paper is the development of a green performance evaluation system. This system integrates both qualitative and quantitative attributes and provides an overall evaluation of the environmental effectiveness of a construction site layout. The proposed evaluation system was validated with a commercial building project. The average utilization ratio of the case study site was calculated as 94%, and lessons learned are discussed in this paper. The case study analysis identified available site spaces around the building and examined how the arrangement of resources and facilities ensures effective connection between construction activities. The findings showed that the facility’s layout plays a crucial role in energy consumption and green performance. The proposed system will support construction project managers to create high-performance construction site layouts in more scientific and systematic ways.


Sign in / Sign up

Export Citation Format

Share Document