scholarly journals Compliance within a Regulatory Framework in Implementing Public Road Construction Projects

2018 ◽  
Vol 18 (4) ◽  
pp. 1-23 ◽  
Author(s):  
Noah Mwelu ◽  
Peter R Davis ◽  
Yongjian Ke ◽  
Susan Watundu

The construction industry faces a lack of compliance with policy that in Uganda public road construction projects affects the attainment of Government goals and disrupts infrastructure project delivery. For decades, public entities have been known for a lack of compliance that manifest in: poor performance, poor personnel management, poor resource utilization and unprofessionalism. In Uganda, this has resulted in several restructures aimed at improving service delivery. Despite this, compliance remains an issue. The purpose of this study is to establish factors affecting compliance within a public procurement regulatory framework in public road construction projects and foster economic development. A cross-sectional research design including a structured self-administered questionnaire survey and PLS-SEM data analysis by SmartPLS3 was conducted. The research reveals that three factors positively affect compliance with a regulatory framework that govern public road construction projects; sanctions on staff, inefficiency of the public procurement regulatory framework and contractors’ resistance to non-compliance. While a further three factors have little positive effect on compliance; familiarity, monitoring activities and professionalism. Hence, the research contributes to construction management by showing that sanctions, perceived inefficiency and contractors’ resistance significantly enhance compliance within a public procurement regulatory framework.

2020 ◽  
Vol 20 (3) ◽  
pp. 209-233 ◽  
Author(s):  
Noah Mwelu ◽  
Peter R. Davis ◽  
Yongjian Ke ◽  
Susan Watundu

Purpose The propose of this study is to focus on the mediating role of compliance with procurement regulatory frameworks in implementing public road construction projects. Design/methodology/approach A cross-sectional research design was adopted. Structured questionnaires were developed in a three-step process including generating items, purifying measurement items and validating measurement items. Variables were anchored on a five-point Likert scale because it is an efficient unidimensional scale that ensures all items measure the same thing and widely applicable in construction research. Findings The findings show that compliance with a public procurement regulatory framework significantly mediates the relationship between familiarity with a public procurement regulatory framework, monitoring activities, sanction on staff and contractors’ resistance to non-compliance and public road construction project success. However, compliance with a public procurement regulatory framework does not mediate the relationship between the professionalism of staff and perceived inefficiency with public road construction projects’ success. Research limitations/implications Limited mediation studies and examples in the public road construction subsector affected this study to comprehensively investigate and compare study findings. Furthermore, the study adopted a cross-sectional research design that limits responses to one point in time. Finally, the study missed out other participants in different organizations and departments that could have had relevant information. Social implications The study contributes to public procurement and construction management research fields by uncovering this strong mediating role of compliance with a public procurement regulatory framework that collectively would help the government to implement public road construction projects successfully. Because no single factor can reliably attain objectives, blending these factors through a hybrid governance system would enable the government to achieve value for money, increase the quality and quantity of paved roads and save funds that can be channeled to other priority sectors for economic development. Originality/value Despite scholarly efforts to establish project success factors, studies have been limited to factors directly impacting the project success without considering a mediating effect among the factors that affect the success of these projects.


2020 ◽  
Vol 10 (5) ◽  
pp. 6195-6199
Author(s):  
J. N. Gatitu ◽  
C. K. Kabubo ◽  
P. Ajwang

Variation orders have been globally identified as a significant reason for poor performance of construction projects. Several variation orders have been identified in the Kenyan construction industry, however, there is a paucity of information on the approaches to minimize their occurrence. The aim of this study is to identify the practices for variation order mitigation in the public road construction sector in Kenya. This is a cross-sectional study that was carried out among the stakeholders (clients, consultants, and contractors) involved in road construction projects. The study used the purposive sampling technique whereby the data were collected with the use of distributed questionnaires among clients, consultants, and contractors’ staff with a technical background in civil engineering. The Relative Importance Index (RII) was used for data analysis. According to the findings of the study, the top five recommended approaches for minimizing variation orders include the provision of adequate planning before the initiation of road construction projects, understanding of the contract provisions by all the parties before project implementation, solving of land disputes before the project tender awards, provision of complete project designs, and provision of a brief project scope during the tendering process. This research, therefore, contributes to a pool of knowledge that will enable practitioners and researchers in the construction industry to develop effective models for minimizing variation orders.


2020 ◽  
Vol 20 (4) ◽  
pp. 377-401 ◽  
Author(s):  
Carmela Di Mauro ◽  
Alessandro Ancarani ◽  
Tara Hartley

Purpose This paper aims to investigate the role of micro, small and medium enterprises (MSMEs) within the Canadian public procurement, by seeking to identify barriers and supporting factors of MSMEs’ participation and success in public tenders. Design/methodology/approach The empirical analysis builds on a unique survey run by the Canadian federal government, which addressed firms either participating or not participating in public tenders. Model estimation on the survey data relies on sample selection methodologies, which allow separating determinants of MSMEs’ decision to participate from determinants of success. Findings Results provide evidence that costs stemming from asset specificity and uncertainty (e.g. costs of bidding, requirements for participation, bundling of contracts and award rules based on minimum price) affect participation in public procurement. Within MSMEs, micro-firms are the most discouraged from participating. However, after controlling for factors affecting participation, micro-firms emerge as having a higher success rate, possibly because of high specialization and joint participation with larger firms. Research limitations/implications Because of the cross-sectional nature of the data used for hypotheses testing, endogeneity may arise if ex post variables affect ex ante decisions. This may apply if participation in procurement feeds on success in past tenders. Social implications Findings may inform policies for the inclusion of smaller firms in the public marketplace. Originality/value To the best of the authors’ knowledge, this study is the first attempting to disentangle determinants of participation in public tenders from determinants of success. Separating the two aspects helps fine-tune SME-friendly public procurement policies, by identifying actions that effectively facilitate success of MSMEs in public tenders.


Author(s):  
Hai Luong Nguyen ◽  
Tsunemi Watanabe

The public procurement sector plays a vital role in the economic development in developing countries such as Vietnam. However, public procurement activities usually perform poorly. This situation can be attributed to ineffective procedures and system (“hardware”) and human resource management (“software”), which occurs at every stage in project purchasing. The poor performance has reduced the effectiveness and efficiency of project delivery in the construction industry, causing delays, cost over-runs, and defects in construction projects. This paper, through working experience and observation by the first author, problems of public procurement were obtained as hypotheses and then validated based on questionnaire surveys and CIS (Construction Industry Structure) model analysis. The survey results indicated a relative correlation with CIS model in description of current construction industry. The study aims to identify issues of public procurement at all stages: pre bid, bid information, evaluation, and award. Based on identified major problems and determined risks, the results are expected to provide a valuable perspective, and thus, to propose necessary strategies to deliver high performance, competition and transparency for the public procurement. In further studies, it is relevant to propose a new model for sustainable public procurement based on the best value approach.


2002 ◽  
Vol 29 (4) ◽  
pp. 589-601 ◽  
Author(s):  
K J Kim ◽  
K H Chin ◽  
Seung H Han ◽  
S K Woo ◽  
Moon-young Cho

The research described in this paper implements a U.S. Department of Defense protocol entitled contractor integrated technical information service (CITIS) in a construction industry application to provide an electronic communication environment for sharing construction information among project participants. CITIS is a contractor-developed service that provides electronic access to and (or) delivery of contractual data to users. For the implementation of the CITIS concept in the construction industry, this research performs process and data modeling on a road construction project, then implements and tests a prototype. This article also introduces an overall procedure to implement the concept of CITIS in construction and identifies some challenges such as the limitations in performing process modeling in the public sector, specifically public road construction projects, the lessons learned, and suggestions in overcoming these difficulties.Key words: construction management, continuous acquisition and life cycle support, contractor integrated technical information service.


2003 ◽  
pp. 68-80
Author(s):  
A. Dementiev ◽  
A. Zolotareva ◽  
A. Reus

The most important measures stimulating the increase of efficiency and effectiveness of budget expenditures on road construction are the improvement of pricing mechanisms and increasing efficiency of the procedures of government purchases of goods, works and services. The paper includes the analysis of main problems that arise in the process of government purchases and construction pricing with the reference to budget expenditure on road construction. It includes the review and analysis of international experience and possible measures of increasing the efficiency and effectiveness of government purchases and (road) construction pricing in Russia.


2020 ◽  
Vol 20 (3) ◽  
pp. 983
Author(s):  
Sovia Sovia ◽  
Netha Damayantie ◽  
Nur Insani

Prediabetes is a threshold condition of diabetes. This situation is often unknown or understood by the public so the incidence rate is undocumented. This research aims to identify the incidence of Prediabetes and its risk factors. The design of the study was cross sectional with a population of 260 and a sample count of 169 people taken purposive sampling. This research was conducted at one of the health education institutions in Jambi City in October and November 2019. Data collection using questionnaires and fasting blood sugar levels. Data analysis uses frequency proportions, Chi-Square, and logistic regression. The results showed a prediabetes incidence of 21.9% and factors affecting it were age (p=0.038, OR 0.423, 95% CI 0.185-0.966), exercise (p=0.002, OR 0.228, 95% CI 0.083-0.626), smoking behavior (p=0.003, OR 3,106, 95% CI 1,425-6,770), and nutritional status (p=0.028). Based on the results of research recommended to promote the activities of Healthy Community Movement in Jambi City and the need to hold posbindu activities regularly every month.


2012 ◽  
Vol 19 (02) ◽  
pp. 162-167
Author(s):  
MUHAMMAD AYAZ BHATTI ◽  
MAHMOOD UR RAHMAN

Objectives: To measure the current status of preventive activities in civil and military hospitals. To compare the quantum ofpreventive and curative activities in the hospitals. To make recommendations for promotion of preventive activities to reduce the curative burdenfrom the hospitals. Study Design: This was a cross-sectional study. Sampling Technique: Universal sampling. All the major military and publicsector hospitals having bed strength more than 400 in Rawalpindi were included in the study. All the preventive and curative work was taken intoaccount. Methodology: A structured questionnaire was developed and data regarding the quantum of work was collected from all the fourmajor Military and civil hospitals having bed strength more than 400 beds through registers and annual reports of the hospital and was analyzedin the form of frequencies, tabulation, cross tabulation, percentages and was displayed in tables and graphs using SPSS (10.5), Microsoft Exceland calculus. Results: Only seven percent work is preventive and ninety three percent is curative. In the preventive activity MH is marginallyhigher than the rest of the hospitals. In all the hospitals among the preventive activities 31% are antenatal visits, 20 % tetanus toxoid injection,19% BCG, Growth monitoring 13%, Measles injection 11% and family planning 6% in all the hospitals. Ante natal activities in the army sectorhospitals are more prominent 39-44% and also in the public sector 17-26%. Next to the antenatal are tetanus toxoids to pregnant ladies whichrange from 16-35% in military and 16-20 % in the public sector hospitals. Growth monitoring is more efficiently carried out in the RawalpindiGeneral Hospital i.e. 17% while in others 7-12%. Family Planning services are delivered very poorly only 9% in RGH and 6% in DHQ, zero % inCMH and 5% in MH. Measles vaccination is carried out efficiently in DHQ 27%, 11% in RGH and 8% in MH and again poorly 3% in CMH. BCG is27% in DHQ, 20% in MH, 17% in RGH and 10% in CMH. Conclusions: The study show that hospitals are showing very poor performance inpreventive aspect and this is the reason that countries like Pakistan are facing economic burden on the national exchequer and this burden willkeep on increasing if no appropriate action is taken.


Author(s):  
Ahmed Alofi ◽  
Yasir Alhammadi ◽  
Dean Kashiwagi ◽  
Kenneth Sullivan

Saudi Arabia has had many issues in delivering mega construction projects, such as delays, high costs, and low customer satisfaction. Some studies show that around 70% of public projects in Saudi Arabia are delayed. One factor that might be causing these performance issues is the traditional low bid contracting system in Saudi Arabia, or the Saudi procurement system. In Saudi Arabia, owners select contractors based only upon the lowest price. This paper researched ways to modify the current Saudi procurement system and show quick and simple modifications that can be done to improve the low performance. This research proposes that by adding the clarification phase from the Performance Information Procurement System (PIPS) to the Saudi traditional procurement process could greatly improve construction performance. The clarification phase requires the selected contractor to submit a project scope, detailed and milestone schedule, potential risks that they do not control, and performance measurement before a contract is awarded. The PIPS system is one of the most successful systems around the world, which shows success rate of 98% in six different countries with risk and cost reduction up to 30%. The clarification phase has been identified as the most important step in the PIPS to ensuring a successful project. This paper conducted a survey among construction professionals in Saudi Arabia, including 157 engineers, 33 consultants 9 owners, 5 vendors, 13 academics, and 28 architects, in order to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. The survey confirmed that professionals in the Saudi construction industry believe that the procurement system should be changed and that the inclusion of the clarification phase to the procurement system is a way to improve the procurement system.