safety criterion
Recently Published Documents


TOTAL DOCUMENTS

109
(FIVE YEARS 39)

H-INDEX

10
(FIVE YEARS 3)

Materials ◽  
2022 ◽  
Vol 15 (1) ◽  
pp. 362
Author(s):  
Parul Chauhan ◽  
Noémie Prime ◽  
Olivier Plé

Rammed earth has the potential to reduce the carbon footprint and limit the energy consumption in the building sector due to its sustainable characteristics. Still, its use is not generalized due to a lack of understanding of the material behavior, notably its sensitivity to water. The coupled hydro-mechanical behavior has been recently studied in the framework of unsaturated soil mechanics, using suction as the parameter to represent the hydric state. This dependency of the mechanical behavior on the hydric state leads to uncertainty of the drying period required to progress in the construction process. Notably, the drying period before building the next floor is unknown. To determine the drying period, thermo-hydro-mechanical coupled finite element method simulations were carried out on a single wall by using the unsaturated soil mechanics approach and safety criterion recommendations from the practical guide for rammed earth construction in France. It was determined that it takes significant time for the construction of additional floor both in ‘summer-like’ and ‘winter-like’ environmental conditions, whereas the walls were far away from the ultimate failure state. Thus the drying periods were overestimated. It was concluded that the safety criterion from the practical guide is very conservative and drying periods can be reduced without significantly compromising the safety factor.


Author(s):  
Yurij Didovets ◽  
Volodymyr Koloskov ◽  
Hanna Koloskova ◽  
Abdulbaqi Jinadu

An analysis of the impact of explosion hazards on the level of environmental safety of disposal and destruction of ammunition. An analysis of existing technologies of land reclamation that can be used for places of disposal and destruction of ammunition, and identified opportunities and limitations of their use. For the first time, a simulation model of the safety management system for land reclamation and ammunition destruction was created. During the development of the model, it is proposed to consider the parameters of the site of disposal and destruction of ammunition, which determine the parameters of explosion risk, and environmental quality indicators, as responses to the influence of factors of operation of the site of disposal and destruction of ammunition. Safety criteria are determined using a regulatory approach in three areas: current factors, explosion risk parameters and environmental quality indicators. The integrated safety criterion is defined as the highest value of all individual safety criteria.


Fire ◽  
2021 ◽  
Vol 4 (4) ◽  
pp. 67
Author(s):  
Seyedeh Tannaz Shams Abadi ◽  
Nojan Moniri Tokmehdash ◽  
Abdelhady Hosny ◽  
Mazdak Nik-Bakht

Construction renovation projects increase the risk of structural fire, mostly due to the accumulation of combustible construction materials and waste. In particular, when the building remains operational during such projects, the redistribution of occupants and interruptions with access corridors/exit egress can exponentially increase the risk for the occupants. Most construction projects are, however, planned and scheduled merely based on the time and budget criteria. While safety is considered paramount and is meant to be applied as a hard constraint in the scheduling stage, in practice, safe evacuation considerations are reduced to rules of thumb and general code guidelines. In this paper, we propose simulation as a tool to introduce safety under structural fire, as a decision criterion, to be mixed with time and budget for selecting the best construction schedule alternative. We have used the BIM (building information model) to extract the building’s spatial and physical properties; and have applied co-simulation of fire, through computational fluid dynamics (CFD), and occupants’ evacuation behavior, through agent-based modeling (ABM) to estimate the average and maximum required safe egress time for various construction sequencing alternatives. This parameter is then used as a third decision criterion, combined with the project’s cost and duration, to evaluate construction schedule alternatives. We applied our method to a three-floor fire zone in a high-rise educational building in Montreal, and our results show that considering the fire safety criterion can make a difference in the final construction schedule. Our proposed method suggests an additional metric for evaluating renovation projects’ construction plans, particularly in congested buildings which need to remain fully or partially operational during the renovation. Thus, this method can be employed by safety officers and facility managers, as well as construction project planners to guide accounting for fire incidents while planning for these types of projects.


2021 ◽  
Vol 13 (18) ◽  
pp. 10441
Author(s):  
Serena Ilari ◽  
Fabio Di Carlo ◽  
Filippo Emanuele Ciarapica ◽  
Maurizio Bevilacqua

The emerging scenario designed by digital technologies connected to Industry 4.0 is pushing towards increasingly sustainable companies. Access to the multiple benefits of digitalization (such as increased productivity, flexibility, efficiency, quality, lower consumption of resources, and the improvement of worker safety) is possible by purchasing new-generation machinery. However, thanks to smart retrofitting processes, companies can extend the shelf life of machinery without replacing it entirely. This work aims to present a framework to assess the sustainability of implementing a smart retrofitting process in old machines as an alternative to replacement from a triple bottom line (economic, environmental, and social) perspective. Due to the multidimensional and multidisciplinary variables that the proposed framework must consider, a multicriteria decision-making process is developed to identify the best transition solution from Industry 3.0 to 4.0. Then, we analyze a case study in which, thanks to the previously proposed methodology, two types of smart retrofitting on a column drill are compared with three replacement options for the same machine tool. In conclusion, the case study shows that retrofitting in the context of Industry 4.0 (or smart retrofitting), despite its high acquisition cost, is the best solution in terms of sustainability, and that this is because the smart retrofitting solution not only positively influences all parameters of digitization but also has a strong impact on the safety criterion.


2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Li He ◽  
Dongwang Zhong ◽  
Yihe Liu ◽  
Kun Song

The reconstruction and expansion project of oil reserve base often faces the excavation and blasting of the slope and undercrossing tunnel at the same time. Due to the flammable and explosive liquid storage nearby, the tight construction period, and the high requirements of collaborative construction, once the blasting accident occurs, the consequences are unimaginable. To facilitate safe and timely cooperative blasting construction of the slope and undercrossing tunnel, a vibration monitoring test of the slope and tunnel surrounding rock is conducted. The vibration response characteristics of the rock surrounding the slope and tunnel are analyzed, and a mathematical prediction model for the peak particle velocity (PPV) with consideration of the influence of the relative slope gradient (H/D) is established based on dimension analysis theory, which improves the prediction accuracy of PPV at the slope surface. ANSYS/LS-DYNA is used to establish a 3D finite element model for the slope and tunnel, and the dynamic response of the tunnel surrounding rock under blasting load is verified through field monitoring data. A linear statistical relationship between PPV and effective tensile stress (ETS) of the tunnel surrounding rock is established. The PPV safety criterion of the tunnel surrounding rock under blasting load is proposed to be 10 cm/s according to the first strength theory, and hence, the minimum safety distance from the tunnel working face to the slope surface is calculated to be 36 m. Finally, the excavation timing arrangement of the slope and tunnel is proposed, which has been successfully applied to the expansion project, and the construction period has been effectively shortened by 45 days while ensuring construction safety. The research results have great guiding significance to similar cooperative blasting excavation engineering for high slope and adjacent tunnel with safety and efficiency.


Mathematics ◽  
2021 ◽  
Vol 9 (17) ◽  
pp. 2171
Author(s):  
Andrey Kositzyn ◽  
Denis Serdechnyy ◽  
Sergey Korchagin ◽  
Ekaterina Pleshakova ◽  
Petr Nikitin ◽  
...  

Recently, we have seen the rapidly growing popularity of unmanned aerial vehicles. This is due to some advantages, namely portability, the ability to fly over hard-to-reach areas without human intervention. They are also widely used for commercial purposes, agriculture, delivery, automation in warehouses. The potential of unmanned aerial vehicles is vast and demonstrates promising opportunities. However, when using these devices, the issue of safety is acute. This article presents a developed software application that is used to improve the efficiency of flight research of groups of unmanned aerial vehicles, based on a new method for assessing flight safety by comparing the complexity of specified air routes. A practical approach to modeling and evaluating the search for a safe way is proposed. A suitable method of research is computer and simulation modeling. It is suggested to use the spectrum of dynamic characteristics of the sequence as a formal attribute for analyzing routes. The method is illustrated by an example of comparing air trajectories according to the flight safety criterion. The software application is intended for use in the educational process when training specialists in transport security, robotics, and system analysis.


Sign in / Sign up

Export Citation Format

Share Document