thick coal seam
Recently Published Documents


TOTAL DOCUMENTS

272
(FIVE YEARS 140)

H-INDEX

17
(FIVE YEARS 7)

2022 ◽  
Vol 2022 ◽  
pp. 1-17
Author(s):  
Wanpeng Huang ◽  
Huanyu Li ◽  
Gang Sun ◽  
Donghai Jiang ◽  
Yanfa Gao

To solve the ground subsidence problem associated with thick coal seam mining under the railway in the Tangshan Mine, the technology of overburden strata separation-zone grouting (OSSG) was proposed. Based on the analysis of the full height overlying strata structure in the range of the six working face areas of the second mining district, the spatial distribution characteristics of the separation zone within the overlying strata are obtained after fully mining the six working faces. Then, emphasis was placed on the selection ratio of grouting materials and the hydrodynamic properties of different grout types, and grouting grout with a high concentration, slow precipitation rate, and good stability was obtained by taking fly ash and local clay as aggregates. The designed grout concentration was approximately 40%; the bulk density was approximately 1.20; and the clay content in the aggregates was approximately 40–50%. The separation-zone grouting plan was designed for the six working faces, and continuous grouting technology with the characteristics of multiple separation zones within the full-height section with a large flow and a high concentration was proposed to form a complete grouting system and reasonable grouting process. After engineering verification, the technology has an ash injection ratio of 24.2%, a grouting ratio of 100.3%, and a reduction in the ground subsidence ratio of 51.5%, effectively reducing mining damage to the ground surface and ensuring the safe operation of ground surface railways. Simultaneously, this advancement improves the resource recovery rate of coal mines and provides greater benefits for mining enterprises.


2021 ◽  
Author(s):  
jianjun SHI ◽  
Feng Jicheng ◽  
Peng Rui ◽  
Zhu Quanjie

Abstract The gob-side entry driving is driving in low pressure area, which bears less support pressure and is easy to maintain, so it is widely used. Taking the gob-side entry driving in thick coal seam of Dongtan Coal Mine as an example, the reasonable size of pillar and the section of roadway are numerically simulated by combining numerical with measurement, and the roadway support is designed. According to the distribution of lateral stress in working face, eight pillars of different sizes are designed. By simulating and comparing the stress distribution of surrounding rock and the development range and shape of plastic zone in different positions, the pillar size of gob-side entry driving is optimized to be 4.5m. According to the results of optimization of roadway section, the section of straight wall semi-circular arch roadway is adopted. According to the analysis, the roadway is supported by bolt + steel mesh + anchor cable. By observing the stability of roadway, it provides experience for the stability study of roadway the gob-side entry driving with small pillar in thick seam.


Geofluids ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Yongqiang Zhao ◽  
Yingming Yang ◽  
Xiaobin Li ◽  
Zhiqi Wang

Taken overlying strata of fully mechanized top coal caving mining (FMTCCM) in 15 m extra thick coal seam as the research object, the comprehensive research methods such as field investigation, theoretical calculation, and numerical analysis are used to systematically analyze. During the mining of extra thick coal seam, the overlying strata form the structure of lower cantilever beam and upper hinged rock beam. The downward transmission caused by the interaction of this combined structure is the fundamental reason for the strong periodic ground pressure behavior of working face and roadway blow. The movement process of overlying strata movement is divided into four stages, and dynamic distribution characteristics of lateral abutment pressure in different stages are obtained. It is considered that the gob side roadway can be in a relatively stable overburden structure and stress environment during the stable stage of abutment pressure. The distribution range of the internal and external stress fields is determined, which provides a theoretical basis for the reasonable roadway layout. At last, the fracture position and abutment pressure evolution process of overlying strata along the goaf side of the extra thick coal seam are further verified by drilling stress measurement.


2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Bin Zhao ◽  
Le Gao ◽  
Xianghui Tian ◽  
Yingyu Sun

The reasonable layout of the roadway in closely spaced, ultra-thick coal seam mining is of great significance to mining safety. Based on the research background of repeated roof leaks in the process of repairing the return air roadway in working face No. 30503 in the Tashan Coal Mine, theoretical analysis, in situ engineering testing, and numerical simulation were jointly adopted to evaluate the stability of the return air roadway under two schemes of repairing the original return air roadway and excavating a new return air roadway. The results show that the vertical mining-induced fissure above the roadway will cause severe damage to the roadway due to the influence of working-face mining when restoration of the roadway excavation is adopted. When choosing to excavate a new return air roadway, the new return air roadway just staggers the vertical cracks located in the top slab of the original return air roadway, putting the roadway in a state of stress reduction, making the roadway itself more stable and conducive to support. Therefore, the new air return tunnel was selected to establish the working face. To ensure safety of the working face during the mining of the original return air roadway, the original return air roadway was filled with high water content materials. Site investigation data show that this material plays a cushioning role in the filling section of the original return air roadway during the mining of the 30503 working face, and the deformation of the new return air roadway during the filling section crossing the original return roadway is stable and well controlled.


2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Yang Yu ◽  
Jianfei Lu ◽  
Dingchao Chen ◽  
Yuxin Pan ◽  
Xiangqian Zhao ◽  
...  

Based on the research background of large section roadway with top coal (LSRTC) in thick coal seam mining in Wangzhuang Coal Mine, Shanxi Province, China, catastrophe characteristics of the surrounding rock of the LSRTC were investigated and summarized. Based on the principle of damage mechanics, the critical size discriminant of the LSRTC was deduced, and the induction mechanism of section size effect and tectonic stress effect on the roadway surrounding rock disaster was revealed. Accordingly, the roadway surrounding rock control principle with the basic idea of “stabilizing and controlling top coal, reconstructing the coal wall, and limiting floor heave” was put forward, and the roadway surrounding rock stability control countermeasures with the core technology of “strong pressure support for roof + grouting reinforcement for two sides + bolt barrier for floor angle” were developed, which solved the surrounding rock control problem of the LSRTC under the action of tectonic stress and provided a useful reference for the difficult problem of roadway surrounding rock control under similar conditions.


2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Xingen Ma ◽  
Manchao He ◽  
Xuewei Sun ◽  
Jianfeng Li ◽  
Gang He ◽  
...  

Gob-side entry retaining technology with roof cutting (GERRC) has been widely used in flat and near-flat coal seam conditions, but its application under inclined coal seam is still very deficient. In order to further improve the application system of GERRC and overcome the application difficulties under special geological conditions, this paper takes the 43073 working face of Yixin coal mine as an example to research the GERRC with upper roadway under gently inclined thick coal seam. Firstly, the difficulties in the upper entry retaining with inclined coal seam are analyzed and the corresponding key technologies and system designs are put forward. Subsequently, the roof cutting and upper entry retaining are designed in detail according to geological conditions of test working face, and the roof cutting and pressure releasing effect is analyzed by numerical simulation to expound the stress distribution and pressure releasing mechanism of surrounding rock. Finally, the upper entry retaining field test is carried out to verify the feasibility and applicability of the technology and related designs. Through field monitoring, it is found that the weighting step increases significantly, the weighting strength decreases effectively on the roof cutting side, and the pressure relief effect is obvious. Meanwhile, the maximum roof to floor convergence is 361 mm and the maximum shrinkage of both sides is 280 mm, so the retained entry can meet the reuse requirement of adjacent working face.


Energies ◽  
2021 ◽  
Vol 14 (22) ◽  
pp. 7712
Author(s):  
Yaokun Fu ◽  
Jianxuan Shang ◽  
Zhenqi Hu ◽  
Pengyu Li ◽  
Kun Yang ◽  
...  

An observatory was established at the Ningtiaota Mine (China) in order to investigate the surface deformation pattern of N00 method workings mining in shallow buried thick coal seams in a windy-sand area. The observatory allows one to measure the coupling between the periodic changes of parameters related to ground subsidence and ground cracks with workings advancement. The data monitored in the field indicate that when the adjacent mining workings are mined below the ground, a sinkhole basin with a larger impact area will be formed. New ground fractures are formed above the mining area to connect with the fractures above the mining face. As a consequence a new pattern of “O” circle distribution beyond the working face is formed, which develops rapidly during the working face recovery. In addition, the dynamic fractures in coal mining are characterized by the phenomenon of self-healing. Our findings will help to protect the surface environment of the mine area during shallow buried high-intensity mining activities in the Lime Tower coal mine, and are also an important guideline in other windy beach mining areas.


Geofluids ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-18
Author(s):  
Qin Guangpeng ◽  
Cao Jing ◽  
Wang Chao ◽  
Wu Shuo ◽  
Zhai Minghua

The stratified mining of super thick coal seam is a process of repeated disturbance of the top roof, especially in the lower stratification, the upper complex rock layer has a greater settlement space, resulting in great changes in the strata structure and fissure distribution. The main coal seam thickness of Rujigou Coal Mine exceeds 20 m, due to the high gas content of the coal seam, it is prone to spontaneous combustion, and the stratified mining method is adopted. When a small-size section coal pillar (less than 10 m) is used, the complex rock structure evolution and fissure development characteristics during the stratified mining of shallow buried thick coal seam will directly affect the movement of gas transportation between the working face and the goaf and will directly affect the safety of the working face. Taking Rujigou coal mine as engineering background, this paper analyzes the breaking structure, fracture development, and evolution law of overlying strata in different layers and different sections of coal seam when the buried depth is shallow, and the extra-thick coal seam is stratified mining. The results show that in the process of stratified mining, the overlying strata break, in addition to the whole trapezoidal failure structure, will also form a local F type fracture structure, and with the stratified downward mining, the F type fracture structure will continue to move up and disappear until it is compacted. The “V” type and “U” type subsidence characteristics of different strata overburden are presented after mining in stratified working face of extra-thick coal seam, and the subsidence amount is approximately symmetrical distribution along the middle line of goaf. In the mining process of the lower part of the layer, the end broken rock block is easy to slip along the hinge point by the hinged rock beam structure, and the sliding instability occurs. In the process of stratified mining of ultrathick coal seam, the main fissure of overburden is mainly longitudinal fissure, and it is very easy to form through with the upper layer and will finally connect with the surface under the condition of shallow buried depth. The inclined cracks connected with the adjacent goaf are formed above the coal pillar of the section, which becomes the passage of gas migration in the goaf. The research conclusion shows that for the stratified mining of high gas thick coal seam, special attention should be paid to the treatment of the gas on the stratified working face. In addition to the conventional gas treatment measures such as coal seam prepumping, the buried pipe pumping in the mining area can also be adopted, which can effectively reduce the gas concentration of the working surface.


Sign in / Sign up

Export Citation Format

Share Document