high risk
Recently Published Documents


TOTAL DOCUMENTS

77575
(FIVE YEARS 23280)

H-INDEX

285
(FIVE YEARS 34)

2022 ◽  
Vol 27 ◽  
pp. 100225
Author(s):  
Michael S. Kraus ◽  
Trina M. Walker ◽  
Diana Perkins ◽  
Richard S.E. Keefe

2022 ◽  
Vol 270 ◽  
pp. 394-404
Author(s):  
Adam R. Dyas ◽  
Michael R. Bronsert ◽  
Robert A. Meguid ◽  
Kathryn L. Colborn ◽  
Anne Lambert-Kerzner ◽  
...  

2022 ◽  
Vol 38 ◽  
pp. 100946
Author(s):  
Shinwan Kany ◽  
Johannes Brachmann ◽  
Thorsten Lewalter ◽  
Ibrahim Akin ◽  
Horst Sievert ◽  
...  

2022 ◽  
Vol 240 ◽  
pp. 186-192
Author(s):  
Kevin C.A. van Gool ◽  
Guusje Collin ◽  
Clemens C.C. Bauer ◽  
Elena Molokotos ◽  
Raquelle I. Mesholam-Gately ◽  
...  

2022 ◽  
Vol 10 (1) ◽  
pp. 022-032
Author(s):  
Okol Sri Suharyo ◽  
Ayip Rivai Prabowo ◽  
Mardi Winoelyo

Surabaya East Shipping Channel is part of the busiest shipping lanes west of Surabaya in Indonesia after inflows in Tanjung Priok. With the navigation, channel conditions are long and narrow plus the number of flows in and out of the harbor boats is very vulnerable to accidents resulting in either the stranded sea, ship collision, or other accident types, which would harm the cruise interocular. By looking at the facts above, so it is necessary to conduct a more in-depth study of the accident risk assessment of the shipping channel east of Surabaya. This study aimed to obtain any kind of accident that has a high risk in the port of Surabaya, to know what impact may result from an accident with a high risk and gain steps that can be taken to reduce accidents in Surabaya East Shipping Channel by using Method Formal Safety Assessment (FSA). Of the six types of accidents that occur, there are three accidents with the highest risk of stranded ships, human accidents, collisions with ships dock at the time of sailing ships and dock. The impact of the third accident caused huge material losses. To reduce the risk of all three types of accidents was measured Implied Cost of Averting a Risk (ICAR), the lowest of any risk reduction options. Reduction of risk to do is impose a routine patrol and installation of signs groove ICAR ports have amounted to 234 million, giving a human rescue training vessel which has a value of 112 million ICAR and the latter is tightened harbor area with ICAR 84 million so that unauthorized parties do not enter in the harbor area.


Sign in / Sign up

Export Citation Format

Share Document