reactive power planning
Recently Published Documents


TOTAL DOCUMENTS

255
(FIVE YEARS 53)

H-INDEX

27
(FIVE YEARS 2)

2022 ◽  
Vol 13 (1) ◽  
pp. 0-0

Over the years the optimization in various areas of power system has immensely attracted the attention of power engineers and researchers. RPP problem is one of such areas. This is done by the placement of reactive power sources in the weak buses and thereafter minimizing the operating cost of the system which is directly dependent on the system transmission loss. The work proposed in this article utilizes FVSI method to detect the weak bus. GWO-PSO is proposed in the current work for providing optimal solution to RPP problem. To test the efficacy of the proposed technique, comparative analysis is then performed among the variants of PSO and hybrid GWO-PSO. The optimal solution rendered by the proposed method is compared with other heuristic algorithms. The proposed method of GWO-PSO generates a reduction of 4.25% in operating cost for IEEE 30 bus and 5.99% for New England 39 bus system. The comparison thus yields that the GWO-PSO hybrid method is superior in generating optimality, diversity and is efficient to generate solution strategies for RPP even in a practical power network.


2022 ◽  
Vol 13 (1) ◽  
pp. 0-0

Over the years the optimization in various areas of power system has immensely attracted the attention of power engineers and researchers. RPP problem is one of such areas. This is done by the placement of reactive power sources in the weak buses and thereafter minimizing the operating cost of the system which is directly dependent on the system transmission loss. The work proposed in this article utilizes FVSI method to detect the weak bus. GWO-PSO is proposed in the current work for providing optimal solution to RPP problem. To test the efficacy of the proposed technique, comparative analysis is then performed among the variants of PSO and hybrid GWO-PSO. The optimal solution rendered by the proposed method is compared with other heuristic algorithms. The proposed method of GWO-PSO generates a reduction of 4.25% in operating cost for IEEE 30 bus and 5.99% for New England 39 bus system. The comparison thus yields that the GWO-PSO hybrid method is superior in generating optimality, diversity and is efficient to generate solution strategies for RPP even in a practical power network.


Author(s):  
Nihar Karmakar ◽  
Biplab Bhattacharyya

AbstractThis paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.


Sign in / Sign up

Export Citation Format

Share Document