Energies ◽  
2022 ◽  
Vol 15 (2) ◽  
pp. 519
Author(s):  
Zhonghuan Su ◽  
Longfu Luo ◽  
Jun Liu ◽  
Zhongxiang Li ◽  
Hu Luo ◽  
...  

Since the transmission distance of submarine cable transmission is inversely proportional to the input frequency, to solve the problem of large losses in the transmission process of offshore wind power, this paper proposes a three-frequency transformer which enables the output of 50 Hz at the input of 50/3 Hz excitation. In this paper, the magnetic flux of a three-dimensional wound core transformer is analytically modeled, the existing condition of magnetic flux harmonics of a three-dimensional wound core transformer is analyzed, the distribution of harmonic content in magnetic flux is obtained, and the principle of realizing frequency conversion is expounded. Secondly, the finite element analysis of the frequency converter is carried out. Finally, a prototype of a frequency transformer is made and tested to verify the correctness of the proposed scheme.


2022 ◽  
Vol 8 ◽  
Author(s):  
Dong-Gyun Han ◽  
Jee Woong Choi

Offshore wind power plants are under construction worldwide, and concerns about the adverse effects of underwater noise generated during their construction on the marine environment are increasing. As part of an environmental impact assessment, underwater noise generated by impact pile driving was measured during the construction of an offshore wind farm off the southwest coast of Korea. The sound exposure levels of impact pile driving noise were estimated as a function of distance and compared with those predicted by a damped cylindrical spreading model and broadband parabolic equation simulation. Source level at 1 m was estimated to be in a range of 183–184 dB re 1μPa2s in the sound exposure level based on the model predictions and it tended to decrease by 21log⁡r as the distance increased. Finally, the spatial distribution of impact pile driving noise was predicted. This result, if combined with noise-induced damage thresholds for marine life, may be used to assess the effects of wind farm construction on marine ecosystems.


2022 ◽  
Author(s):  
Mehmet Bilgili ◽  
Hakan Alphan

Abstract Due to the commissioning of floating wind units, the latest technological developments, significant growth, and improvements in turbines, developments in offshore wind power capacity are estimated to increase faster than in the last two decades. The total installed offshore wind power capacity, which is currently 35 GW, is predicted to be approximately 382 GW by 2030 and approximately 2,002 GW by 2050. For this reason, attempts are proposed to lower levelised cost of electricity (LCOE) for offshore wind power generation more than for other energy sources. In this study firstly, the global growth in the nominal capacity and size of offshore wind turbines over the last twenty years is examined. Then, the effects of this increase in nominal capacity and size on the LOCE, total installation cost (TIC), and turbine capacity factor are investigated. In parallel with this development, the changes in distance to shore and water depth for installation offshore wind power plants are reviewed according to the years. In addition, the effects of this global growth on wind farm capacity, turbine-specific power capacity, number of turbines per GW, and area needed per GW are investigated and discussed in detail.


2022 ◽  
Vol 14 (1) ◽  
pp. 449
Author(s):  
Jie Huang ◽  
Xiaolu Huang ◽  
Nanqi Song ◽  
Yu Ma ◽  
Dan Wei

Actively promoting the development of offshore wind power is an inevitable choice if the People’s Republic of China plans to fulfill its international commitments, respond to climate change, ensure energy security, and improve energy infrastructure. Inevitably, offshore wind power development will conflict with other marine activities, including mariculture and shipping. Therefore, learning how to develop offshore wind power without affecting the environment or conflicting with other marine activities is crucial to the conservation of spatial marine resources. The rapid development of offshore wind power in Liaoning Province has allowed researchers to develop an index system that can be used to evaluate the suitability of offshore wind power development sites by considering costs, environmental protection, and sea management. Spatial analysis and a multi-attribute evaluation method integrating a fuzzy membership function were used to evaluate offshore wind farm placement in Liaoning. The results classified 5%, 18%, 21%, and 56% offshore areas of Liaoning as very suitable, relatively suitable, somewhat unsuitable, and unsuitable for wind power development, respectively. The results of this paper can provide a reference for decision makers who plan for offshore wind farm locations under the constraints of high-intensity development.


2021 ◽  
Vol 2 (4) ◽  
Author(s):  
Fei Duan ◽  
Yuliang Liu

This paper presents a floating transportation equipment (FTE) for the negative pressure suction bucket foundation (NPSBF) of offshore wind turbines, and the basic design and main transportation means are introduced. The hydrodynamic characteristics of integrated FTE-NPSBF structure are comprehensively studied. The ability of FTE as a transportation aid to provide stability for the NPSBF is verified, and the vibration reduction measures under the condition of wave resonance during the floating transportation process are given.


2021 ◽  
Vol 12 ◽  
pp. 70-82
Author(s):  
Ba Nam Pham ◽  
Thi Ngoan Nghiem ◽  
Minh Phuong Dao ◽  
Thi Lan Oanh Nguyen ◽  
Hien Trang Ta ◽  
...  

By 2050, blue hydrogen (produced by SMR method using CCS technology to capture CO2) will make up about 18% of hydrogen supply, whilst green hydrogen from solar power will account for 16%, from onshore wind power 16% and offshore wind power 9%. Global hydrogen demand is forecasted to increase to about 150 million tons by 2040 [1]. The article analyses the objective factors (i.e. size and structure of the economy, technological and social barriers) and policies of countries that affect hydrogen market development.


2021 ◽  
Vol 9 (12) ◽  
pp. 1448
Author(s):  
Yuh-Ming Tsai ◽  
Cherng-Yuan Lin

The Taiwan Strait, to the west of Taiwan, is rich in wind energy resources and has the greatest offshore wind power potential in the world. Therefore, Taiwan has been actively expanding its offshore wind power industry in this area in recent years and expects to achieve the total installed capacity to 15.6 GW by 2035. Due to the large vessel traffic flow in Western Taiwan’s sea area, wind farms will inevitably reduce the navigable space and shadow some existing marine aids to navigation, thus worsening navigation safety. An approach using a fault tree analysis was used to carry out analysis of collision risk between ship-to-ship and ship-to-turbine. The vessel density distribution and traffic flow within the open sea of offshore wind farms would further increase to curtail the available navigable space. The shadowing effects along navigation channels would thereafter be worsened to raise the probability of collision risks in the sea. The results of the fault tree analysis revealed that if the ship is out of control, the time allowed to provide assistance is rather short, leading to the increase of collision risk extent between ships and wind turbines. Moreover, the study also found that unfit functions of the Vessel Traffic Service System and navigation aids and frequently and arbitrarily crossing the navigation channel of fishery vessels are the main causes of ship collisions. In order to effectively improve the navigation safety, competitive strategies for navigation safety are investigated and evaluated in this study. These strategies include making a complete plan for utilizing the whole sea, integrating the offshore vessel traffic service and management system, providing remote pilotage services, and building salvage vessels. The above promising strategies would enhance the navigation safety within the open sea. Collision risk might occur once marine accident occurs and no salvage vessel is available.


2021 ◽  
Vol 9 (12) ◽  
pp. 1371
Author(s):  
Min-Yuan Cheng ◽  
Yung-Fu Wu

With a plan to achieve a target of 5.7 GW offshore wind power capacity in 2025, Taiwan anticipates building a 36-billion USD industry, which makes Taiwan a center of attention in the global marketplace of civil engineering construction. Aimed at Taiwan’s underwater foundations industries, this study is the first to develop an investment evaluation model (IEM) by applying FPR to obtain risk factor weights and calculate the overall investment risk value with a numerical scoring method. In a context where no precedent exists for reference, this study provides auxiliary and supportive tools to help builders to make the decision, based on objective indicators, whether to undertake an investment. To date, no research has been conducted to introduce a reasonable mathematical model that discusses the issue of partner selection in the field of offshore wind power. This study is the first paper to construct a SWARA-FTOPSIS partner selection model, which enables underwater foundations builders to take specific Taiwanese characteristics into account in their selection of the best partners to meet transportation, construction, and installation requirements. Finally, the study uses the case of the Taipower Offshore Wind Power Project (2nd phase) to verify the feasibility of this model.