initial layout
Recently Published Documents


TOTAL DOCUMENTS

26
(FIVE YEARS 15)

H-INDEX

4
(FIVE YEARS 0)

2021 ◽  
Vol 5 (2) ◽  
pp. 118
Author(s):  
Elfania Hartari ◽  
Dene Herwanto

PT. Adhimix Precast Indonesia is engaged in the construction sector by producing concrete and construction. Layout design is needed so that the existing land can be utilized optimally and material transfer is more effective and efficient. This can affect the distance and time of the transfer so that the cost of moving can be minimized. In practice, the company's trajectory condition only has one path (trajectory) for alternating current and crossing production lines, so it is considered inefficient to move both goods and workers, coupled with the existence of land that is not used properly, therefore improvements are needed to the production floor layout. in order to minimize the cost of moving goods and have a definite path (trajectory). Systematic Layout Planning (SLP) is a method for redesigning a layout (re-layout) based on the results of distance optimization and Material Handling Costs (OMH). The amount of OMH in the initial layout (now) is Rp. 2,614,200 with a total track distance of 39.82m and OMH in the proposed layout with a total track distance of 19.17m, the result is Rp. 1,534,200, this proves that the proposed layout can be applied because there is a decrease in total OMH by 35.44% or Rp. 926,580. PT. Adhimix Precast Indonesia bergerak di bidang pembangunan dengan memproduksi beton dan konstruksi. Perancangan tata letak diperlukan agar lahan yang ada dapat dimanfaatkan dengan maksimal dan pepindahan material lebih efektif dan efisien. Hal ini dapat mempengaruhi besar jarak dan waktu perpindahan sehingga besar biaya perpindahan dapat diminimalkan. Pada pelaksanaannya kondisi lintasan perusahaan hanya memiliki satu jalur (lintasan) untuk arus bolak balik dan persilangan alur produksi maka dianggap tidak efisien untuk dilakukan perpindahan baik barang maupun pekerja, ditambah dengan adanya lahan yang tidak dimanfaatkan dengan baik oleh karena itu dibutuhkan perbaikan pada layout lantai produksi agar dapat meminimalkan biaya perpindahan barang dan memiliki jalur (lintasan) yang pasti. Systematic Layout Planning (SLP) merupakan metode untuk membuat perancangan ulang suatu layout (re-layout) berdasarkan hasil dari optimalisasi jarak dan Ongkos Material Handling (OMH). Besar OMH pada layout awal (sekarang) adalah Rp 2.614.200 dengan total jarak lintasan 39,82m dan OMH pada layout usulan dengan total jarak lintasan 19,17m didapat hasil sebesar Rp. 1.534.200, hal ini membuktikan bahwa layout usulan dapat diterapkan karena terjadi penurunan total OMH sebesar 35,44% atau Rp. 


2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Eko Budi Prasetyo ◽  
Atika Sidhi Cahyana

This industry, established since 2009, is one of the industries for making raw crackers with various kinds of crackers, which is located in simo angin-angin village, sidoarjo city which produces various kinds of crackers, namely casandra crackers, rose crackers, braid crackers and made with quality flour and fuel. to oven, namely with the steam obtained from the boiler / steam boiler. This study aims to design and suggest improvements to the facility layout properly and the flow of materials smoothly, so that the material travel distance is not too long and can reduce the alternating flow of the production process material in CV Andi Jaya with the Activity Relation Chart method with the application blocplan. One indicator that can determine how good a Layout is is by comparing the total moments in the Layout. From the results of the calculation of total moment efficiency using BLOCPLAN shows better results, where there is an increase of 0.52% from the existing condition or initial layout.


2021 ◽  
Vol 10 (2) ◽  
pp. 172-181
Author(s):  
Harry Imanullah ◽  
◽  
Hesty Heryani ◽  
Agung Nugroho ◽  
◽  
...  

This study aims to obtain an optimal facility layout by considering the distance between the workstations, transfer time, and material handling cost in a bakery. The research was conducted at a medium-scale bread producer CV Mumtaz Bakery in Banjarbaru City, South Kalimantan. The initial layout of CV Mumtaz Bakery's production facilities is considered as not optimal for production capacity up to 500 kg per day. The layout analysis and the appearance of improvement alternatives were carried out using the BLOCPLAN algorithm, and then the design implementation was carried out using CorelDraw software. Determination of the best layout alternative is based on the highest R-Score. The results showed that the best layout was the one with an R-Score of 0.86. This selected workstation layout has a total distance between processing stations of 31.70 m, a total transfer time of 25 seconds, and a material handling cost of IDR 434.29 for each batch. This layout will reduce the total material transfer distance and the material transfer time from the initial layout by 14.67% and 10.7% respectively.


Author(s):  
Syafirman Pramija ◽  
◽  
Meipen Meipen ◽  

This paper aim is to investigate the work system for printing service and redesign facility layout improvement. A case study was conducted in small company namely Pelangi Advertising Printing. The Systematic Layout Planning (SLP) was adopted in this paper. The input data and activities in the SLP process are as follows: material flow, activity relationship, string diagrams, area requirement, area available, space relationship diagrams, modification consideration and practical limitations. The results of this study indicated the application of SLP in case study company can increase in facility layout efficiency from 96.7% to 98.5%. The redesign facility layout result was more effective than the initial layout.


2021 ◽  
Vol 10 (2) ◽  
Author(s):  
Beni Harma ◽  
Helga Ika Sudra

Activities carried out in the warehouse include material handling. Generally, the costs involved in material handling activities are quite large. One method that can be used in managing the layout of raw material placement in raw material warehouses is the class based storage method. Class based storage is a policy that divides storage into three classes A, B and C based on Pareto law. Pareto law is the principle of putting items that have the greatest accessibility near the Input-Output point. The distance of material handling to the initial layout raw material warehouse is 3,513,337 meters / month and the material handling costs are Rp. 134,534,765 / month, because the initial layout of the raw material warehouse still uses random storage and the raw materials that are widely used are not placed close to the intake floor of the production, so that the distance to get raw materials for production needs is far. After the re-layout design was made based on the placement of raw materials in the class based storage method, the material handling transfer distance was reduced to 2,644,459 meters / month and the material handling cost for the repair raw material warehouse layout fell to Rp. 99,949,520 / month. In other words, there was a decrease in material handling distance by 25% and material handling costs by 26%.


2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Muhammad Rizky Fauzi ◽  
Athika Sidhi Cahyana

Unplanned layout of the facility and not paying attention to the distance will be able to experience an increase in time during the production process. From the results of observations that have been made at CV. Faris Collections needs to improve the facility layout in department E, namely the grouping of fabrics, due to frequent piling up of fabrics. Lack of utilization of area and distance of material transfer that is too long for department I, namely cloth embroidery. This proposed layout planning uses the TCR method, which is the calculation of the closest associated distance to each production department, which is described in the ARC which requires the relationship between each activity in the area of ​​production so that it fully refers to the TCR calculation results. This planning also uses the CORELAP Algorithm in order to obtain a proposed layout plan that is able to convert qualitative value data into quantitative data. The results of the CORELAP Algorithm are the main basis for knowing the initial lay-out coordinates and the proposed layout, and the coordinate values ​​will be entered into the WinQSB software to determine the level of efficiency. The efficiency level of the CORELAP Algorithm is 9%, and the efficiency of changes between departmental distances in the initial layout and proposed layout is 18%.


Personification of the present disclosure can be viewed as providing methods for creating a web site. In this respect, one embodiment includes the following steps: receiving a choice of a design template to be used in creating the website, the design template providing an initial layout for pages of the website and recommended content, rendering for display a representation of the website from the design template in a development environment, wherein the representation provides controls for editing content and layout of the website representation and the rendering produces HTML files that are displayed to a user and enabling the user to edit design features of the website based upon a rendered view of the website in the development environment, a presently displayed representation of a web page having editing tools embedded in the web page. Preferably, models conform to various types of web pages and other features that are typically found or visible on websites. There may be different options for each feature. The innovation is to provide a platform for making it easy to build websites and pages based on stored templates that enable the website and pages to be modified and configured without the user needing to write any software code


Author(s):  
Tranggono Tranggono ◽  
Nur Rahmawati ◽  
Kinanti Resmi Hayati

Manufacturing companies spend a significant amount of time and money designing or redesigning their facilities. It is an extremely important function that must be addressed before products are produced. Manufacturing company’s common problem is that they do not have a pattern for placing goods in their warehouse. It leads to problems such as difficulties when taking the product from storage. With storage procedures like this, it can make long total distance for loading and unloading the goods. Dedicated storage policy where storage is done at a certain location according to the type of item needs to be made. The advantage of this method is ease in finding goods as the location can be tailored to the shape of the goods. The research results show an efficiency of the displacement distance of 4117 m, the initial layout distance of moving goods is 5740 m, while in the proposed layout it is 1622 m.


2020 ◽  
Vol 4 (3) ◽  
pp. 253-264
Author(s):  
Arham Arham ◽  
Asngadi Asngadi ◽  
Syamsuddin Syamsuddin

This study aims to analyze the effectiveness and efficiency of layout inTahu Super Afifah Factory in Nunu Village, Tatanga District, West Palu. The type of research used is quantitative research using line balancing method and travel chart. Result of research by using line balancing method obtained efficiency of tofu production process equal to 90,04% with idle time 9,96%. While the result of travel chart method obtained new design layout of production facility of factory know Super Afifah which more effective equal to 441,74 material flow load from initial layout equal to 627,38 material flow load. By comparison 185.64 material flow load or 29.58%. Penelitian ini bertujuan untuk menganalisis efektivitas dan efesiensi tata letak pada Pabrik Tahu Super Afifah di Kelurahan Nunu Kecamatan Tatanga Palu Barat. Jenis penelitian yang digunakan adalah penelitian kuantitatif dengan menggunakan metode line balancing dan travel chart. Hasil penelitian dengan menggunakan metode line balancing diperoleh efesiensi dari proses produksi tahu sebesar 90,04% dengan waktu menganggur 9,96%. Sedangkan hasil dari metode travel chart diperoleh rancangan baru tata letak fasilitas produksi pabrik tahu Super Afifah yang lebh efektif sebesar 441,74 beban aliran bahan dari tata letak mula-mula sebesar 627,38 beban aliran bahan dengan perbandingan 185,64 beban aliran bahan atau 29,58%.


2020 ◽  
Vol 3 (1) ◽  
pp. 27-40
Author(s):  
Pria Tubagus ◽  
Saharuddin Kaseng ◽  
Asngadi Asngadi

Basically, the purpose of production management is directed to create production efficiency and effectiveness to improve the results and contribute to the maximum profit achievement of the company. One of the problems in production management that influences the efficiency and effectiveness of production is layout arrangement of production facilities. This research is conducted through direct observation in Banana Chips Company ‘Cahaya Indi’ located in Donggala District. The type of research is quantitative using line balancing method and travel chart. The result of the line balancing method shows the efficiency of banana chips production process is 90,73% with idle time of 9,27%. While the result of travel chart method indicates a new layout design of banana chips production facility at Cahaya Indi is more effective with material flow load of 198,83 from the initial layout of 259,93. Pada dasarnya, tujuan manajemen produksi selalu diarahkan pada terciptanya efisiensi dan efektifitas produksi, agar dapat meningkatkan hasil produksi serta memberikan konstribusi yang maksimal terhadap laba perusahaan. Salah satu permasalahan manajemen produksi yang berpengaruh terhadap efisiensi dan efektifitas produksi adalah pengaturan tata letak (layout) fasilitas produksi. Penelitian ini dilakukan dengan cara observasi langsung pada Cahaya Indi yang bertempat di Kabupaten Donggala. Jenis penelitian yang diguanakan adalah penelitian kuantitatif dengan menggunakan metode line balancing dan travel chart. Hasil penelitian dengan menggunakan metode line balancing diperoleh efisiensi dari proses produksi kripik pisang sebesar 90,73% dengan waktu menganggur 9,27%. Sedangkan hasil dari metode travel chart diperoleh rancangan baru tata letak fasilitas produksi kripik pisang pada Cahaya Indi yang lebih efektif sebesar 198,83 beban aliran bahan dari tata letak mula-mula sebesar 259,93 beban aliran bahan.