A Robust optimization approach to assess the effect of delays in the connection-to-the-grid time of new generation power plants over transmission expansion planning

2015 ◽  
Vol 229 (1) ◽  
pp. 703-741 ◽  
Author(s):  
Enzo Sauma ◽  
Fernando Traub ◽  
Jorge Vera
2014 ◽  
Vol 29 (6) ◽  
pp. 3069-3077 ◽  
Author(s):  
Bokan Chen ◽  
Jianhui Wang ◽  
Lizhi Wang ◽  
Yanyi He ◽  
Zhaoyu Wang

Sign in / Sign up

Export Citation Format

Share Document