An improved algorithm for integrated production and distribution scheduling problem with committed delivery dates
2013 ◽
Vol 46
(4)
◽
pp. 503-520
◽
2018 ◽
Vol 30
(1)
◽
pp. 31
◽
2010 ◽
Vol 38
(2)
◽
pp. 133-138
◽
2018 ◽
Vol 30
(1)
◽
pp. 31
2011 ◽
Vol 58-60
◽
pp. 399-403
◽