Four decades of research on the open-shop scheduling problem to minimize the makespan
Keyword(s):
2018 ◽
Vol 8
(3)
◽
pp. 1121-1132
Keyword(s):
Keyword(s):
Keyword(s):
Keyword(s):
2011 ◽
Vol 59
(9-12)
◽
pp. 1143-1155
◽
Keyword(s):
2000 ◽
Vol 26
(4)
◽
pp. 181-192
◽
Keyword(s):
Keyword(s):
2012 ◽
Vol 45
(8)
◽
pp. 1657-1667
◽
Keyword(s):