Improved makespan of the branch and bound solution for a fuzzy flow-shop scheduling problem using the maximization operator
Keyword(s):
2019 ◽
Vol 52
(6)
◽
pp. 1009-1036
◽
2020 ◽
Vol 284
(3)
◽
pp. 814-833
◽
Keyword(s):
2014 ◽
Vol 38
(1)
◽
pp. 119-134
◽
2020 ◽
Vol 1003
◽
pp. 012129
Keyword(s):
2008 ◽
pp. 336-339
Keyword(s):
2005 ◽
Vol 29
(11-12)
◽
pp. 1186-1193
◽
Branch and Bound Method with Heuristic Algorithm for a Special Flexible Flow Shop Scheduling Problem
2010 ◽
Vol 139-141
◽
pp. 1530-1534
◽