An Adaptative Multi-GPU Based Branch-and-Bound. A Case Study: The Flow-Shop Scheduling Problem
Keyword(s):
2018 ◽
Vol 96
(1-4)
◽
pp. 531-546
Keyword(s):
2019 ◽
Vol 506
◽
pp. 012064
Keyword(s):
2019 ◽
Vol 52
(6)
◽
pp. 1009-1036
◽
Keyword(s):
2020 ◽
Vol 284
(3)
◽
pp. 814-833
◽
Keyword(s):
2014 ◽
Vol 38
(1)
◽
pp. 119-134
◽
2020 ◽
Vol 1003
◽
pp. 012129
Keyword(s):
2015 ◽
Vol 42
(15-16)
◽
pp. 6196-6204
◽