An efficiency improvement of flexible flow shop scheduling in automotive part company
Keyword(s):
Flexible flow shop is becoming more interested and applied in industries due to its impact from higher workloads. Flexible flow shop scheduling problem is focused to minimize the makespan. A metaheuristic model based on Hybrid Tabu Search is developed to overcome this problem. Firstly, Hybrid Tabu Search is modelled based on the factory data. The Earliest Due Date rule is used as the scheduling method for the current status. FlexSim simulation software is used to evaluate the Hybrid Tabu Search model. The outcome is validated with two different basic heuristic solutions; Campbell, Dudek and Smith’s and Gupta’s heuristics. It is found that the proposed model can improve the job sequence based on makespan criteria.
2007 ◽
Vol 38
(7-8)
◽
pp. 691-704
◽
2021 ◽
Vol 106
◽
pp. 104503
2007 ◽
Vol 4
(11)
◽
pp. 887-895
◽
Keyword(s):
2013 ◽
Vol 1
(1)
◽
pp. 51
◽
Keyword(s):
2007 ◽
Vol 4
(11)
◽
pp. 889-896
Keyword(s):
Keyword(s):
Keyword(s):