Multi-trip Pickup and Delivery Problem, with Split Loads, Profits and Multiple Time Windows to Model a Real Case Problem in the Construction Industry
2019 ◽
Vol 279
(3)
◽
pp. 824-839
◽
Keyword(s):
1991 ◽
Vol 54
(1)
◽
pp. 7-22
◽
2014 ◽
Vol 6
(2)
◽
pp. 171-197
◽
2019 ◽
Vol 109
◽
pp. 122-133
◽
Keyword(s):
2020 ◽
Vol 7
(4)
◽
pp. 1134-1153
◽
2016 ◽
Vol 250
(3)
◽
pp. 782-793
◽