CONSTRUCTION SCHEDULING WITH TABU SEARCH ALGORITHM AND UNCERTAIN DATA
2012 ◽
Vol 166
(4)
◽
pp. 80-95
Keyword(s):
This paper deals with some problems of synchronizing construction activities differing in their execution times. The methodology of calculating the times of execution of the activities, ensuring that there will be no collisions between them, is presented. The methodology is illustrated with numerical examples showing the successive steps of the algorithm and it is applied to complex works modelled as the flow shop problem. The tabu search algorithm is adapted to solve the problem.