scholarly journals COST VALUE-STREAM MAPPING AS A LEAN ASSESSMENT TOOL IN A SURGICAL GLOVE MANUFACTURING COMPANY

2021 ◽  
Vol 32 (1) ◽  
Author(s):  
Rajesh B Menon ◽  
P R Shalij ◽  
P Sajeesh ◽  
Geemon Tom ◽  
V R Pramod
Author(s):  
B. Rajesh Menon ◽  
P.R. Shalij ◽  
K.R. Kiron ◽  
J. Sreejith ◽  
P. Sajeesh

Author(s):  
Kiron K.R. ◽  
P.R. Shalij ◽  
B. RAJESH MENON ◽  
J. Sreejith ◽  
P. Sajeesh

2014 ◽  
Vol 915-916 ◽  
pp. 1405-1411
Author(s):  
A.N.A. Ahmad ◽  
Sulaiman Hj. Hasan ◽  
H. Norafifah

Value stream mapping (VSM) was initially developed to use of the suite of tools to help researcher or practitioner to identify waste in individual value streams and find an appropriate method to its removal. The process itself is simple and straightforward is used to identify waste using lean manufacturing technique, determined causes of the waste through the value stream mapping method and to propose solution to improve workplace environment. In this project is made an attempt to computerize the process though the application of VSM. Computerize value stream system is basically a method which is an internet networking system combining traditional concept of value stream mapping method to be used at manufacturing company to reduce wastes. This paper summarizes the way to develop an internet, online and network based of an efficient computerize value stream system to improve operation value of the manufacturing company. This paper reviews the design of package that will replace the manual method of doing VSM. This package will be applied in a real shop floor environment.


Author(s):  
V. Saravanan ◽  
S. Nallusamy ◽  
Abraham George

Productivity is an important parameter for all small and medium scale manufacturing industries. Lean manufacturing emerged as production strategy capable of increasing productivity by identifying and eliminating non value added activities. This article deals with productivity improvement in a pre-assembly line of gearbox manufacturing company with a case study using lean concepts like process flow chart, process Gantt chart and time study. This paper illustrates using a case study on how a value stream mapping has to be carried out in a planet carrier pre-assembly line. Value stream mapping and work standardization are the key tools used in lean manufacturing and lean transformation. It makes the process smoother, helps in reduction of lead time and ultimately increasing the productivity. From the observed results it was found that, the productivity has been increased from 7 pieces to 10 pieces in the first step assembly when the proposed VSM was implemented. The second step processing time was reduced by the execution of proposed value stream mapping with TAKT time of 126 minutes and 165 minutes of processing time for demand of 10 pieces were achieved and the overall processing time has been reduced by about 24%.


2014 ◽  
Vol 660 ◽  
pp. 1038-1042 ◽  
Author(s):  
Md Saidin Wahab ◽  
Kamsidi Abd Malek Sidek ◽  
Mohd Shahir Yahya ◽  
Muhammad Mustaqim Ahmat

The purpose of this study is to develop a value stream mapping for a production in an aircraft manufacturing company. The process begins with creating a current state map and understands the production flow and the current cycle times. This provides the information needed to produce a future state map. The goal is to identify and eliminate the waste, which is any activity that does not add value to the final product, in the production process. In order to collect the information needed, the study was conducted within the production facility to enable the researcher gained knowledge and familiarized with the production flow and the activities being performed at the shop floor. Parameters such as cycle times, down times, work in process (WIP) for inventory and material, and information flow paths were recorded. This information will enable the researcher to visualize the current state of the process activities by mapping the material and information flow and looking for opportunities to eliminate wastes. ARENA simulation software package was used to simulate and analyze the process flow and times. Result from the analysis shows that there are areas where the company can further improve their production system. The results show the improvement of the cycle time up to 22% based on the new proposed arrangement of the layout. Therefore the propose layout will be guided to the company in order to improve their production.


Author(s):  
S. Nallusamy

Nowadays, Lean manufacturing application is reported for manufacturers in global level.Those reports have exposed that this application has enabled the companies to become competitivethrough the elimination of wastes while producing products and offering services. Various tools like5S, Poka Yoke, Kaizen, Kanban, JIT, etc have been used while implementing lean manufacturingmodel in various types of organization. Recently, both researchers and practitioners have found thatValue Stream Mapping (VSM) technique serves as a powerful vehicle in enabling organizations toimplement lean manufacturing model. Meanwhile, it is found that lean manufacturing model is yet tobe applied in the case of certain manufacturing products. One among those products is gear shaft. Inthis background the theoretical proposition of implementing lean manufacturing model in the case ofmanufacturing a gear shaft has been investigated in this article.


Sign in / Sign up

Export Citation Format

Share Document