Modification in Chen and Tsai’s method for solving time–cost trade-off problems of project networks in fuzzy environments

2012 ◽  
Vol 23 (3-4) ◽  
pp. 1045-1050
Author(s):  
Parmpreet Kaur ◽  
Amit Kumar
Keyword(s):  
1998 ◽  
Vol 49 (11) ◽  
pp. 1153 ◽  
Author(s):  
E. Demeulemeester ◽  
B. De Reyck ◽  
B. Foubert ◽  
W. Herroelen ◽  
M. Vanhoucke

1998 ◽  
Vol 49 (11) ◽  
pp. 1153-1163 ◽  
Author(s):  
E Demeulemeester ◽  
B De Reyck ◽  
B Foubert ◽  
W Herroelen ◽  
M Vanhoucke

1996 ◽  
Vol 88 (1) ◽  
pp. 50-68 ◽  
Author(s):  
Erik L. Demeulemeester ◽  
Willy S. Herroelen ◽  
Salah E. Elmaghraby

1998 ◽  
Vol 49 (11) ◽  
pp. 1153-1163
Author(s):  
E Demeulemeester ◽  
B De Reyck ◽  
B Foubert ◽  
W Herroelen ◽  
and M Vanhoucke

1982 ◽  
Vol 14 (2) ◽  
pp. 109-113 ◽  
Author(s):  
Suleyman Tufekci
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document