Time–cost trade-off analysis of project networks in fuzzy environments
2011 ◽
Vol 212
(2)
◽
pp. 386-397
◽
1998 ◽
Vol 49
(11)
◽
pp. 1153
◽
Linear programming based approaches for the discrete time/cost trade-off problem in project networks
2010 ◽
Vol 61
(4)
◽
pp. 676-685
◽
1998 ◽
Vol 49
(11)
◽
pp. 1153-1163
◽
1996 ◽
Vol 88
(1)
◽
pp. 50-68
◽
1998 ◽
Vol 49
(11)
◽
pp. 1153-1163
1995 ◽
Vol 121
(4)
◽
pp. 446-454
◽