Busy-period analysis of a two-unit warm standby system with inspection time
1983 ◽
Vol 23
(2)
◽
pp. 341-346
◽
1985 ◽
Vol 25
(4)
◽
pp. 675-679
◽
1992 ◽
Vol 32
(1-2)
◽
pp. 17-19
◽
Keyword(s):
s-expected busy period of 1-server 2-unit warm standby system subject to different repair strategies
1982 ◽
Vol 22
(3)
◽
pp. 399-403
◽
1980 ◽
Vol 20
(4)
◽
pp. 449-455
◽
1983 ◽
Vol 23
(3)
◽
pp. 453-465
◽
2008 ◽
Vol 36
(2)
◽
pp. 98-100
◽