A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs
2011 ◽
Vol 61
(4)
◽
pp. 920-929
◽
2005 ◽
Vol 32
(4)
◽
pp. 727-747
◽
2008 ◽
Vol 35
(4)
◽
pp. 1374-1376
◽
1989 ◽
Vol 20
(1)
◽
pp. 120-133
◽
2000 ◽
Vol 66
(2)
◽
pp. 159-169
◽
1994 ◽
Vol 75
(2)
◽
pp. 395-404
◽
A grasp for single machine scheduling with sequence dependent setup costs and linear delay penalties
1996 ◽
Vol 23
(9)
◽
pp. 881-895
◽
2017 ◽
Vol 13
(1)
◽
pp. 413-428