A new formulation for a variant of the Capacitated Lot Sizing and Scheduling Problem with Sequence Dependent setup costs and times: Single machine, multiple products and periods
2005 ◽
Vol 32
(4)
◽
pp. 727-747
◽
2008 ◽
Vol 35
(4)
◽
pp. 1374-1376
◽
2011 ◽
Vol 61
(4)
◽
pp. 920-929
◽
1994 ◽
Vol 75
(2)
◽
pp. 395-404
◽
2015 ◽
Vol 63
◽
pp. 72-82
◽
1989 ◽
Vol 20
(1)
◽
pp. 120-133
◽
2010 ◽
Vol 54
(9-12)
◽
pp. 1109-1119
◽