Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
Keyword(s):
Keyword(s):
2011 ◽
Vol 412
(48)
◽
pp. 6712-6719
◽
Keyword(s):
2009 ◽
Vol 17
(04)
◽
pp. 559-584
◽
2019 ◽
Vol 52
(6)
◽
pp. 1009-1036
◽
2013 ◽
Vol 67
(1-4)
◽
pp. 243-253
◽
2013 ◽
Vol 40
(7)
◽
pp. 1874-1883
◽
Keyword(s):