A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming☆
2011 ◽
Vol 4
(4)
◽
pp. 497-508
◽
2011 ◽
Vol 4
(4)
◽
pp. 497
◽
2011 ◽
Vol 1
(1)
◽
pp. 64
2010 ◽
Vol 128
(1)
◽
pp. 144-152
◽
2019 ◽
Vol 646
◽
pp. 012037
◽
2019 ◽
Vol 128
◽
pp. 67-80
◽
Keyword(s):
Keyword(s):