flowshop scheduling problem
Recently Published Documents


TOTAL DOCUMENTS

460
(FIVE YEARS 99)

H-INDEX

49
(FIVE YEARS 7)

Author(s):  
Ali Allahverdi ◽  
Harun Aydilek ◽  
Asiye Aydilek

We consider a no-wait m-machine flowshop scheduling problem which is common in different manufacturing industries such as steel, pharmaceutical, and chemical. The objective is to minimize total tardiness since it minimizes penalty costs and loss of customer goodwill. We also consider the performance measure of total completion time which is significant in environments where reducing holding cost is important. We consider both performance measures with the objective of minimizing total tardiness subject to the constraint that total completion time is bounded. Given that the problem is NP-hard, we propose an algorithm. We conduct extensive computational experiments to compare the performance of the proposed algorithm with those of three well performing benchmark algorithms in the literature. Computational results indicate that the proposed algorithm reduces the error of the best existing benchmark algorithm by 88% under the same CPU times. The results are confirmed by extensive statistical analysis. Specifically, ANOVA analysis is conducted to justify the difference between the performances of the algorithms, and a test of hypothesis is performed to justify that the proposed algorithm is significantly better than the best existing benchmark algorithm with a significance level of 0.01.


2021 ◽  
pp. 107832
Author(s):  
Korhan Karabulut ◽  
Damla Kizilay ◽  
M. Fatih Tasgetiren ◽  
Liang Gao ◽  
Levent Kandiller

2021 ◽  
Vol 11 (21) ◽  
pp. 10102
Author(s):  
Jianguo Zheng ◽  
Yilin Wang

In this paper, a hybrid bat optimization algorithm based on variable neighbourhood structure and two learning strategies is proposed to solve a three-stage distributed assembly permutation flowshop scheduling problem to minimize the makespan. The algorithm is firstly designed to increase the population diversity by classifying the populations, which solves the difficult trade-off between convergence and diversity of the bat algorithm. Secondly, a selection mechanism is used to update the bat’s velocity and location, solving the difficulty of the algorithm to trade-off exploration and mining capacity. Finally, the Gaussian learning strategy and elite learning strategy assist the whole population to jump out of the local optimal frontier. The simulation results demonstrate that the algorithm proposed in this paper can well solve the DAPFSP. In addition, compared with other metaheuristic algorithms, IHBA has better performance and gives full play to its advantage of finding optimal solutions.


Sign in / Sign up

Export Citation Format

Share Document