Baptism and John the Baptist

2021 ◽  
pp. 90-101
Keyword(s):  
1996 ◽  
Author(s):  
George W. Shannon ◽  
Goodwin Jr. ◽  
Hewitt R. C. ◽  
Lawrence L.

2015 ◽  
Vol 19 (4) ◽  
pp. 79-86 ◽  
Author(s):  
Michał Pieńko ◽  
Aleksander Robak ◽  
Ewa Błazik-Borowa

Abstract This article describes three cases of scaffolding use as a structure for carrying out a renovation work at the Cathedral in Lublin. In order to achieve optimum access to the object, one used modular scaffolding. This type of scaffold is able to expand in any direction. In addition to the typical use, the scaffold was used as temporary roofing which allowed conducting the work during the winter. Monuments require a detailed approach to the problem of scaffolding. Despite the short period of use we should pay particular attention to the possibility of anchoring scaffoldings. Performing static calculation allows minimizing the number of anchors and used elements.


Gesta ◽  
1985 ◽  
Vol 24 (1) ◽  
pp. 3-12 ◽  
Author(s):  
George Henderson
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document