Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time
2015 ◽
Vol 66
(5)
◽
pp. 709-719
◽
Keyword(s):
2019 ◽
Vol 52
(6)
◽
pp. 1009-1036
◽
2013 ◽
Vol 40
(7)
◽
pp. 1874-1883
◽
Keyword(s):
2021 ◽
Vol 21
(3)
◽
pp. 1-12
Keyword(s):
Keyword(s):
2011 ◽
Vol 38
(1)
◽
pp. 152-164
◽
Keyword(s):
2021 ◽
Vol 11
(3)
◽
pp. 2266
2011 ◽
Vol 412
(48)
◽
pp. 6712-6719
◽
Keyword(s):
Keyword(s):
2010 ◽
Vol 53
(9-12)
◽
pp. 1189-1197
◽