Inspection, Condition Assessment, and Management Decisions for Commercial Roof Systems

2010 ◽  
Vol 16 (3) ◽  
pp. 94-99 ◽  
Author(s):  
Donald P. Coffelt ◽  
Chris T. Hendrickson ◽  
Sean T. Healey
2014 ◽  
Vol 41 (9) ◽  
pp. 811-818 ◽  
Author(s):  
Soroush Khazraeializadeh ◽  
Leon F. Gay ◽  
Alireza Bayat

Condition assessment is a key component of successful asset management, and many diverse condition assessment protocols exist for sewer mains. These protocols are used to generate condition grades for sewer mains after inspection. Condition assessment protocols are important because renewal actions for sewers are prioritized based on condition grades. If condition grades assigned to sewers do not reflect actual pipe conditions close enough, the resulting allocation of resources will not be the best. This paper presents a comparison of three possible sewer condition assessment protocols for the City of Edmonton: the Pipeline Assessment and Certification Program quick grading method, the Manual of Sewer Condition Classification fourth edition, and the City of Edmonton’s Sewer Physical Condition Classification Manual. The results show that structural sewer condition grades depend significantly on the protocol used; therefore, protocol selection has significant financial consequences for asset management programs in the city.


1992 ◽  
Vol 23 (1) ◽  
pp. 6-8 ◽  
Author(s):  
Carol W. Lawrence

Speech-language evaluation reports from many institutions present age-equivalent scores as the evidence for speech-language deficits. Yet, the value and interpretation of this measurement criterion requires clinical scrutiny. This article reviews the concept and derivation of age-equivalent scores and presents arguments against their use in case management decisions.


2003 ◽  
Vol 40 (1) ◽  
pp. 97-103 ◽  
Author(s):  
John M. Goldman ◽  
David Marin

1980 ◽  
Vol 19 (01) ◽  
pp. 37-41
Author(s):  
R. F. Woolson ◽  
M. T. Tsuang ◽  
L. R. Urban

We are now conducting a forty-year follow-up and family study of 200 schizophrenics, 325 manic-depressives and 160 surgical controls. This study began in 1973 and has continued to the present date. Numerous data handling and data management decisions were made in the course of collecting the data for the project. In this report some of the practical difficulties in the data handling and computer management of such large and bulky data sets are enumerated.


2012 ◽  
Author(s):  
Michael D. Gossett ◽  
Graham E. C. Bell ◽  
Steven R. Fox ◽  
Keith R. Bushdiecker ◽  
Richard Pousard, Jr.

2013 ◽  
Author(s):  
Julie Bell ◽  
Vicki Francis ◽  
Marc Wegner ◽  
Graham E. C. Bell
Keyword(s):  

2015 ◽  
Author(s):  
Madeleine R. Driscoll ◽  
Anna Santino
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document