The uncertainty recovery analysis for interdependent infrastructure systems using the dynamic inoperability input–output model
2013 ◽
Vol 46
(7)
◽
pp. 1299-1306
◽
2015 ◽
Vol 1
(1)
◽
2011 ◽
Vol 17
(4)
◽
pp. 151-162
◽
Keyword(s):
Keyword(s):
2011 ◽
pp. 599-608
Integrating restoration and scheduling decisions for disrupted interdependent infrastructure systems
2011 ◽
Vol 203
(1)
◽
pp. 279-294
◽
2020 ◽
Vol 46
◽
pp. 101515
◽