Case Study Well Test Analysis on Gas Well in Basement Granite Reservoir of South Sumatera

2019 ◽  
Author(s):  
Dimas Panji Laksana ◽  
Ratnayu Sitaresmi ◽  
Hari Karyadi Oetomo ◽  
Arditya Puspiantoro
1991 ◽  
Vol 6 (03) ◽  
pp. 393-400
Author(s):  
D.M. Walsh ◽  
K.H. Leung

1972 ◽  
Author(s):  
Hossein Kazemi

Abstract Two simple and equivalent procedures are suggested for improving the calculated average reservoir pressure from pressure buildup tests of liquid or gas wells in developed reservoirs. These procedures are particularly useful in gas well test analysis irrespective of gas composition, in reservoirs with pressure-dependent permeability and porosity, and in oil reservoirs where substantial gas saturation has been developed. Long-term production history need not be known. Introduction For analyzing pressure buildup data with constant flowrate before shut in, two plotting procedures are mostly used: The Miller-Dyes-Hutchinson (MDH) plot (1,8) and the Horner plot (2,8). The Miller-Dyes-Hutchinson plot is a plot of pws vs log Δt. The Horner plot consists of plotting the bottom hole shut-in pressure, pws vs log [(tp + Δt)/Δt]. Δt is the shut-in time and tp is a pseudo-production time equal to the ratio of total produced fluid and the last stabilized flowrate prior to shut in. This method was first used by Theis (3) in the water industry.


Sign in / Sign up

Export Citation Format

Share Document