Practical Tips for Modelling Lot-Sizing and Scheduling Problems
2009 ◽
Vol 3
(2)
◽
pp. 37-48
Keyword(s):
A Priori
◽
This paper presents some important alternatives for modelling Lot-Sizing and Scheduling Problems. First, the accuracy of models can improved by using short time buckets, which allow more detailed planning but lead to higher computational effort. Next, valid inequalities make the models tighter but increase their size. Sometimes it is possible to find a good balance between the size and tightness of a model by limiting a priori the number of valid inequalities. Finally, a special normalization of the variables simplifies the presentation of results and validation of models.
2011 ◽
Vol 5
(1)
◽
pp. 49-56
2013 ◽
Vol 40
(1)
◽
pp. 303-317
◽
2020 ◽
Vol 84
◽
pp. 1-18
◽
Keyword(s):
2020 ◽
Vol 284
(2)
◽
pp. 485-497
◽
Keyword(s):
2015 ◽
Vol 54
◽
pp. 12-20
◽
Keyword(s):
2003 ◽
Vol 16
(01)
◽
pp. 21
◽
2020 ◽
Vol 219
◽
pp. 236-247
◽